Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,932 companies....

Construction News

04/09/2008

State Of The Art Façade For North Glasgow College

James & Taylor, the UK’s leading supplier of cladding, have been putting the finishing touches to a £26m college project in Glasgow, with a façade that uses an ‘invisible’ fixing system.

Catriona McReynolds, senior architect at RMJM said: "North Glasgow College is a new build facility in the Springburn area of the city. The 16,900m2 development will be home to a state-of-the-art learning resource centre, conference facilities and fully equipped sports hall, providing a new social heart for students and the surrounding community.

"For the main building we were looking for a robust rainscreen panel that would give a very crisp, flush, high gloss white finish, as well as be an affordable alternative to other rainscreen products on the market."

James & Taylor responded with a tailored, state-of-the-art design using Carea rainscreen, a large-format glazed concrete panel system. Carea is a relatively new product to the UK and James & Taylor is the sole supplier.

-- Advertisement --
NorthernAsbestosServicesLtd

Instead of conventional, visible screw fixings, which tend to give this type of façade an industrial look, Carea panels are fitted from the base of the building upward on to a simple system of aluminium support rails. This provides a seamless finish. Most rainscreen systems need a 10mm open joint, which can expose an unsightly backing structure. The Carea rail provides a closed 3mm joint on the horizontal rail, adding to the flawless look. The horizontal rail has an angled flange in the joint to force water to escape down the front face of the panel.

James & Taylor supplied 4000m2 of Carea Glazed white panels in various sizes.

Available in any RAL colour and a number of textures, the 14mm thick panels are formed in various sizes to a maximum of 1800 x 900mm. They are made from polyester resin concrete, 88% mineral deposit and 12% resin. The coating is applied when the panels are wet and they are kiln-fired for about 12 hours to create the finished glazed surface. Panels are then cut to size to fit the building and grooved to accept the fixing rails at the factory. The surface finish is UV stable and designed to provide a long-lasting cladding system.

Carea offers a single tile replacement method that enables the client to access the substructure without having to remove a whole section of cladding. If a panel is damaged after construction, it can be replaced as part of routine maintenance.

(GK/KMcA)

Latest Construction News

20/10/2026
Scotland's leading public sector framework provider has opened bidding for a £900 million Refurbishment and Modernisation programme aimed at delivering urgent and planned works across housing and public buildings. The Scottish Procurement Alliance's Refurbishment and Modernisation framework (RM4S)
Read More
20/10/2026
A £1 million grant programme has been launched to help owners return vacant listed buildings across Glasgow to productive use. The Heritage Building Viability Grant Scheme, funded by Glasgow City Council and administered by Glasgow City Heritage Trust, is designed to bring floorspace in some of the
Read More
20/10/2026
Road resurfacing on the A702 at West Linton will take place over six nights from Monday 9 to Friday 13 November, and on Monday 16 November 2026, requiring overnight closures. Transport Scotland's operating company, BEAR Scotland, will deliver the scheme. For safety, the A702 will be closed each ni
Read More
20/10/2026
SP Energy Networks chief executive Nicola Connelly has welcomed the launch of a new industry plan setting out how the biggest grid upgrade in living memory will boost employment and economic growth across the UK. The Electricity Networks Sector Growth Plan – led by the Energy Networks Association (
Read More
20/10/2026
An £8 million scheme is under way to enhance accessibility for passengers at Dalwhinnie and improve performance on the Highland Main Line. The project will install a new crossover so trains can switch between tracks, enabling northbound services to use Platform 1 when step-free access is required.
Read More
20/10/2026
The Scottish Government intends to award Wills Bros Civil Engineering Ltd the contract to dual the A9 between Pitlochry and Killiecrankie, Economy, Tourism and Transport Secretary Stephen Flynn has announced. The move represents the final stage of procurement for the fifth A9 Dualling scheme to rea
Read More
20/10/2026
Residents in Clackmannanshire are already benefiting from a new electric nine-seater minibus provided by Robertson Construction Central East, part of the contractor's social value commitments linked to the Wellbeing Village and Lochies School development in Alloa. During construction, the vehicle i
Read More
20/10/2026
A major new study will examine how climate change could trigger cascading disruption across Scotland's critical infrastructure, giving organisations a clearer view of risks to the services people rely on daily. Commissioned by the Climate Ready Infrastructure Scotland Forum (CRIS) — a partnership o
Read More
20/10/2026
Clark Contracts has secured a place on Pagabo's Major Works Framework, enhancing its ability to support public sector bodies in delivering major construction and refurbishment schemes. The framework, expected to be worth up to £5bn over four years, follows the creation of a 10-year strategic delive
Read More
20/10/2026
North Ayrshire Council has carried out its annual winter dry run this month as it gets ready for the colder months. Roads staff took part in the exercise as part of preparations to keep roads, footways and communities safe and accessible during severe weather. It follows a meeting of Cabinet at wh
Read More
SEEIT3DGalaxy Window BlindsAlternative Tying Systems LtdSips Eco Panel Systems LtdApollo Scaffolding Ties LtdHBB GeoSales LtdFP McCann LtdContainexSEEIT3DHutton Stone Co Ltd