Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,047 companies....

Construction News

23/10/2023

Final Phase Of Leith Engine Yard Complete

The final phase of Places for People's, The Engine Yard n Leith, has been officially opened following seven years of construction.

The iconic, former tram depot located in Leith, Edinburgh, originally opened in 1898 as the Shrubhill Tramway Workshops and Power Station, the workshops were where Edinburgh's trams were built and maintained.

In November 1956, the last tram service terminated at the depot, which was briefly repurposed as a bus depot, a museum and finally a Fringe venue before a leaking roof caused it to be abandoned completely, leaving the site to run into disrepair.

In 2020 LDN Architects with Places for People put forward an imaginative plan for the former brownfield site to deliver a desirable, mixed-tenure community that would not only recognise the history of the site but act as a catalyst for the regeneration of the local area.

Roddy MacDonald, Places for People Regional Managing Director of Developments, Scotland commented: "The Tram Sheds represents a tremendous feat for Places for People as a housebuilder. The restoration of the historic tram depot into 43 modern luxury apartments has taken years of careful consideration, consultation and planning. I am delighted with the finished product and I'm sure our purchasers will be too.

-- Advertisement --
NorthernAsbestosServicesLtd

"With our strong and diverse experience in buying, planning and building award-winning developments – and with the completion of The Engine Yard's final, impressive phase – we've delivered something truly distinctive just a stone's throw away from Edinburgh's bustling city centre.

"It's wonderful to witness this thriving community now come to life with a hive of creativity and cultural diversity packed with eclectic shops, bars and restaurants, just a short walk from the city centre – fast become one of Edinburgh's most exciting new places to live."

LDN Architect's Partner in Charge Ángel Morales-Aguilar, commented on the intricate – yet ultimately rewarding process – of keeping this iconic piece of Edinburgh's industrial heritage alive.

"For us, the main challenge lay in effectively integrating the new buildings within the existing ones. Essential fabric repair work was required to make the buildings structurally sound while ensuring that their unique character was retained. From a purely practical perspective, gaining access to and working around the existing site presented a whole new challenge of its own."

"But the result is phenomenal," he continued. "Being able to save these two industrial gems – the Big Shed and the Wee Shed – is rewarding enough in itself, but introducing a new dimension to the space through the central courtyard and upper levels has been my favourite part. Until now, no one has been able to experience The Tram Sheds like this."

The latest addition to the Engine Yard development sees a collection of forty-three high-specification one, two and three-bedroom homes, built into the original structure, and bringing a fusion of old and new style against an ageing architecture.

The mix of apartments and duplexes offers unique urban living within a charming, historic setting. Each spacious home encompasses a contemporary, open-plan design, with the ultra-modern industrial theme marrying happily with the traditional character of the past. Beautiful arched and oval windows offer stunning views of Edinburgh and beyond.

The heritage-led design continues into the outer spaces while the historical octagonal brick chimney – visible from Leith Walk – provides a magnificent focal point. There's even an underground car park.

Latest Construction News

22/07/2026
The £26m Grade A office at Dundee Waterfront, delivered by Robertson for Dundee City Council as part of the city's £1.6bn regeneration programme, has reached full occupation after global software firm N-able joined existing tenant Thorntons. Built by Robertson Construction Tayside, the six-storey J
Read More
22/07/2026
Ground has broken on a permanent spectator stand and team dugouts at the Meadowbank grass pitch at Kirkwall Grammar School (KGS). The project is fully funded by the Scottish Football Association and was proposed by the newly formed Orkney Football Hub, which brings together representatives from Ork
Read More
22/07/2026
Transport Scotland's operating company, BEAR Scotland, will renew approximately 900 metres of road surface to deliver smoother and safer journeys for drivers. A signed diversion will be in place, directing traffic to remain on the M9 northbound to turn at Junction 9, then return southbound to exit
Read More
22/07/2026
CCG (Scotland) has started the second phase of the Athletes' Village development in Glasgow's East End, beginning construction of 58 affordable homes for mid-market rent aimed at households on low to middle incomes. The scheme is funded by socially conscious investor Thriving Investments and marks
Read More
22/07/2026
The Scottish Government is increasing support for small and medium-sized haulage firms by allocating an additional £1 million to its SME Fleet Analysis Support fund, following strong interest from operators across the country. This next phase will enable more businesses to access tailored assessmen
Read More
22/07/2026
Galliford Try has been selected for the new Crescent Purchasing Consortium (CPC) Construction and Capital Works framework. The company’s appointment spans all five regional lots across England, Wales and Scotland. The framework, which will run for a maximum of eight years, will be used to procure a
Read More
22/07/2026
SP Energy Networks is rolling out advanced technology to ensure Glasgow's electricity system is ready to support athletes, officials and visitors during Glasgow 2026. As part of a major resilience programme, the network operator has been testing Power Survey's state-of-the-art Mobile Asset Assessme
Read More
22/07/2026
Major strides have been made in recent months on the Corran Ferry Infrastructure Improvement Scheme (CFIIS), with activity advancing at both Nether Lochaber and Ardgour. Supported by £30 million via the Inverness and Highland City-Region Deal—comprising £20 million from the UK Government and £10 mi
Read More
21/07/2026
Kier has been appointed to the new YORhub YORbuild Major Works 2 framework, worth £1.5bn, enhancing its capacity to deliver major public sector projects across Yorkshire and the Humber, the North East and neighbouring areas. The framework provides access to substantial building schemes for eligible
Read More
21/07/2026
Residents, community organisations and other stakeholders are being urged to share their views in the latest phase of Stirling's new Local Development Plan (LDP) consultation before the deadline. This round focuses on the overall spatial strategy for the area and the specific site options being cons
Read More
SEEIT3DLSMannCreagh Concrete Products LtdThe Sandstone SpecialistsMr TintRBT Underfloor LimitedE & P BricklayingSinclair Industries LtdOrd Industrial & Commercial Supplies LtdPlant Machinery Trading