Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,932 companies....

Construction News

21/06/2023

Milestone In Delivery Of Aberdeen City Centre Masterplan

Aberdeen City Council has announced that it is nearing completion of a major road improvement project, to support the delivery of the Aberdeen City Centre Masterplan.

Works to improve capacity and flow on South College Street are nearing completion with new junctions and lanes due to open.

South College Street from Wellington Place to Millburn Street and Palmerston Place will reopen today (Wednesday 21 June 2023), with the remaining southern section of South College Street expected to open in July.

Traffic signals at the new North Esplanade West/ Palmerston Place junction will be switched on tomorrow, allowing drivers to turn right from North Esplanade West into Palmerston Place.  Drivers may only turn left when exiting Palmerston Place on to North Esplanade West at the new junction.

The final section providing a second left turn lane from Palmerston Place will come in to use during Autumn following the completion of utility works.

-- Advertisement --
NorthernAsbestosServicesLtd

The South College Street Junction Improvements project includes a package of junction improvements and road widening measures and there will also be shared and segregated facilities for pedestrians and cyclists alongside the road.

The main changes to the area include:

• An additional traffic lane along South College Street between Bank Street and Wellington Place;

• An additional lane on Palmerston Place;

• A new traffic signal controlled junction at the intersection of Palmerston Place/ North Esplanade West;

• The alteration of the existing traffic signal-controlled junctions at the South College Street/Wellington Place junction and the South College Street/Millburn Street/Palmerston Place junction adding additional approach lanes and improving operational coordination;

• New and altered walking and cycling infrastructure along the South College Street and Palmerston Place;

• Reconfigured parking and loading areas on South College Street between Millburn Street and Riverside Drive.

The project will support the City Centre Masterplan’s infrastructure strategy for bus priority measures aimed at removing the impact of congestion on bus journey times through the city centre. It will also enable the implementation of public realm enhancements along Guild Street and Union Street, providing alternative options to accommodate the rerouting of vehicular traffic. The project is jointly funded by Aberdeen City Council and a grant from the Scottish Government’s Bus Partnership Fund.

As part of the Roads Hierarchy which is changing access to and around the city after the bypass (AWPR) was built, South College Street and associated roads will have an important role in providing a key route to the city centre as well as facilitating bus priority measures nearby.

Latest Construction News

20/10/2026
Scotland's leading public sector framework provider has opened bidding for a £900 million Refurbishment and Modernisation programme aimed at delivering urgent and planned works across housing and public buildings. The Scottish Procurement Alliance's Refurbishment and Modernisation framework (RM4S)
Read More
20/10/2026
A £1 million grant programme has been launched to help owners return vacant listed buildings across Glasgow to productive use. The Heritage Building Viability Grant Scheme, funded by Glasgow City Council and administered by Glasgow City Heritage Trust, is designed to bring floorspace in some of the
Read More
20/10/2026
Road resurfacing on the A702 at West Linton will take place over six nights from Monday 9 to Friday 13 November, and on Monday 16 November 2026, requiring overnight closures. Transport Scotland's operating company, BEAR Scotland, will deliver the scheme. For safety, the A702 will be closed each ni
Read More
20/10/2026
SP Energy Networks chief executive Nicola Connelly has welcomed the launch of a new industry plan setting out how the biggest grid upgrade in living memory will boost employment and economic growth across the UK. The Electricity Networks Sector Growth Plan – led by the Energy Networks Association (
Read More
20/10/2026
An £8 million scheme is under way to enhance accessibility for passengers at Dalwhinnie and improve performance on the Highland Main Line. The project will install a new crossover so trains can switch between tracks, enabling northbound services to use Platform 1 when step-free access is required.
Read More
20/10/2026
The Scottish Government intends to award Wills Bros Civil Engineering Ltd the contract to dual the A9 between Pitlochry and Killiecrankie, Economy, Tourism and Transport Secretary Stephen Flynn has announced. The move represents the final stage of procurement for the fifth A9 Dualling scheme to rea
Read More
20/10/2026
Residents in Clackmannanshire are already benefiting from a new electric nine-seater minibus provided by Robertson Construction Central East, part of the contractor's social value commitments linked to the Wellbeing Village and Lochies School development in Alloa. During construction, the vehicle i
Read More
20/10/2026
A major new study will examine how climate change could trigger cascading disruption across Scotland's critical infrastructure, giving organisations a clearer view of risks to the services people rely on daily. Commissioned by the Climate Ready Infrastructure Scotland Forum (CRIS) — a partnership o
Read More
20/10/2026
Clark Contracts has secured a place on Pagabo's Major Works Framework, enhancing its ability to support public sector bodies in delivering major construction and refurbishment schemes. The framework, expected to be worth up to £5bn over four years, follows the creation of a 10-year strategic delive
Read More
20/10/2026
North Ayrshire Council has carried out its annual winter dry run this month as it gets ready for the colder months. Roads staff took part in the exercise as part of preparations to keep roads, footways and communities safe and accessible during severe weather. It follows a meeting of Cabinet at wh
Read More
SEEIT3DExcavator Parts DirectBilanco Blinds LtdMcghee Training GroupCal-Due UK LimitedGarage Floors DirectInsulation Installers ScotlandElectrac NISOLV GROUPDryburgh Associates Limited