Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,047 companies....

Construction News

18/05/2022

Views Sought On Proposed Extension Of Trial Cycle Route

Ayrshire Roads Alliance (ARA) are seeking input on the proposed extension of the trial cycle route segregation scheme on Grassyards Road between Strawberrybank Road and MacKenzie Drive.

A review of the original Grassyards Road cycle lane scheme was held in August 2021 and requests were received by both cyclists and non-cyclists to extend the trial further along Grassyards Road to cover the section of cycle lane outside Willowbank School. Extending the scheme will address the issue of vehicles parking in the cycle lane and preventing its use by cyclists. It will also connect to the cycle route between Hurlford and the town centre (Mackenzie Drive/Kay Park Terrace). 

-- Advertisement --
NorthernAsbestosServicesLtd

Work on the extension was completed on 22 April and double yellow lines have also been added at junctions in the nearby residential areas to ensure that any displaced vehicles do not obstruct junctions.

To monitor the impact of the scheme on traffic flows and road user behaviour, ARA will be carrying out site inspections as well as commissioning speed and volume surveys and monitoring displacement parking. This extended trial will initially be provided until October 2022 while the additional monitoring is undertaken. 

The feedback received will be used to decide how the scheme progresses.

Funding for the project has come from the Spaces for People programme, a temporary infrastructure programme in Scotland funded by the Scottish Government and managed by Sustrans Scotland.

Latest Construction News

22/07/2026
The £26m Grade A office at Dundee Waterfront, delivered by Robertson for Dundee City Council as part of the city's £1.6bn regeneration programme, has reached full occupation after global software firm N-able joined existing tenant Thorntons. Built by Robertson Construction Tayside, the six-storey J
Read More
22/07/2026
Ground has broken on a permanent spectator stand and team dugouts at the Meadowbank grass pitch at Kirkwall Grammar School (KGS). The project is fully funded by the Scottish Football Association and was proposed by the newly formed Orkney Football Hub, which brings together representatives from Ork
Read More
22/07/2026
Transport Scotland's operating company, BEAR Scotland, will renew approximately 900 metres of road surface to deliver smoother and safer journeys for drivers. A signed diversion will be in place, directing traffic to remain on the M9 northbound to turn at Junction 9, then return southbound to exit
Read More
22/07/2026
CCG (Scotland) has started the second phase of the Athletes' Village development in Glasgow's East End, beginning construction of 58 affordable homes for mid-market rent aimed at households on low to middle incomes. The scheme is funded by socially conscious investor Thriving Investments and marks
Read More
22/07/2026
The Scottish Government is increasing support for small and medium-sized haulage firms by allocating an additional £1 million to its SME Fleet Analysis Support fund, following strong interest from operators across the country. This next phase will enable more businesses to access tailored assessmen
Read More
22/07/2026
Galliford Try has been selected for the new Crescent Purchasing Consortium (CPC) Construction and Capital Works framework. The company’s appointment spans all five regional lots across England, Wales and Scotland. The framework, which will run for a maximum of eight years, will be used to procure a
Read More
22/07/2026
SP Energy Networks is rolling out advanced technology to ensure Glasgow's electricity system is ready to support athletes, officials and visitors during Glasgow 2026. As part of a major resilience programme, the network operator has been testing Power Survey's state-of-the-art Mobile Asset Assessme
Read More
22/07/2026
Major strides have been made in recent months on the Corran Ferry Infrastructure Improvement Scheme (CFIIS), with activity advancing at both Nether Lochaber and Ardgour. Supported by £30 million via the Inverness and Highland City-Region Deal—comprising £20 million from the UK Government and £10 mi
Read More
21/07/2026
Kier has been appointed to the new YORhub YORbuild Major Works 2 framework, worth £1.5bn, enhancing its capacity to deliver major public sector projects across Yorkshire and the Humber, the North East and neighbouring areas. The framework provides access to substantial building schemes for eligible
Read More
21/07/2026
Residents, community organisations and other stakeholders are being urged to share their views in the latest phase of Stirling's new Local Development Plan (LDP) consultation before the deadline. This round focuses on the overall spatial strategy for the area and the specific site options being cons
Read More
SEEIT3DKattrak International LtdG M Joinery Scotland LtdLogical Insulation Solutions LimitedK A Tree SurgeryClaymore Training LimitedCross BlindsK&C LandscapesThomas Haywood Aerial PhotographyEnvironmental Dust Solutions Ltd