Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,047 companies....

Construction News

07/01/2022

First Images Of New MSIP Innovation Hub

The first images have been released of Michelin Scotland Innovation Parc's (MSIP) new flagship space, the Innovation Hub.

MSIP, a joint venture between Michelin, Dundee City Council and Scottish Enterprise, is a world-class Innovation Parc in Dundee for sustainable mobility and decarbonisation, which aims to drive growth and diversity in the Scottish economy whilst addressing the global climate emergency.

The Innovation Hub will be a purpose-built facility at the heart of MSIP, supporting collaboration and innovation between organisations of different shapes and sizes.

It will be a place where businesses, researchers and challenge-holders can work together on developing, testing, and commercialising new products and services for a sustainable, low carbon future.

Alongside the 1,200 square metre physical development, MSIP will deliver an associated programme of innovation activity and will provide access to support programmes.

The Innovation Hub will be located on the east side of MSIP, at the main entrance of the Innovation Parc. The facilities, which will include hot-desking, meetings rooms, event spaces, design workshops and a café, will be available to everyone working on the Innovation Parc and others that can benefit from what it offers.

Dundee City Council previously secured £3.5M of funding from the Tay Cities Deal Industrial Investment Fund to support the Innovation Hub. Detailed design work is already underway, and the planning application has been submitted.

-- Advertisement --
NorthernAsbestosServicesLtd

Robertson Construction was appointed in 2020 as the build contractor for MSIP's wider transformation programme, which was procured through Procurement Hub Major Projects framework.  Construction will begin on the Innovation Hub in early 2022 with completion expected in 2023.

Colin McIlraith, Chief Operating Officer at MSIP said: "The Innovation Hub is a core part of the transformation programme, which is already underway and brings everything else that we offer at MSIP together.

"The design for the Innovation Hub provides a dynamic space housing a changing mixture of people, all aspiring to achieve the same goal of net zero. It's also important to showcase our mission in everything we do, and we've worked hard to ensure that the design considers the environmental impact of the space, both in its development and in the future when it will be in use.

"It's great to be able to now share what the Innovation Hub will look like. It's ambitious but achievable, which is what MSIP is all about."

Sarah Petrie, Innovation Director, MSIP said: "The Innovation Hub will be the focal point for MSIPs innovation activity and the place where the earliest stages of innovation and entrepreneurship are initiated.

"It's a key part of the offer at MSIP and will be a driver for business formation and growth, harnessing know-how, expertise and entrepreneurial spirit – a gateway for new businesses and a stepping-stone for small businesses.

"It is vital that this space is an exciting, modern, fun, and accessible environment, to attract and retain the best talent and to stimulate ideas, enthusiasm, and collaboration. Looking at the exciting designs shared today, I have no doubt we will deliver that."

Craig Heap, Project Director at Holmes Miller, said: "With the Innovation Hub being home to a mix of start-ups, SMEs, and large corporates, as well as researchers and students – all of whom are working together to bring us closer to Net Zero – we had to create a dynamic space that is flexible enough to meet a range of needs, both now and in the future.

"Crucially, sustainability is at the heart of the project, and every effort has been taken to minimise the environmental impact of the building, both in terms of its construction and its ongoing operation and maintenance, which includes its own green and sustainable energy supply. Ultimately, the new hub will help inspire users and visitors and showcase MSIP as a modern, fast-moving, and ambitious collaboration, driving forward innovation in low-carbon transport and sustainable mobility."

Kevin Dickson, Regional Managing Director at Robertson Construction Tayside said: "Robertson is honoured to support Phase 2 of MSIP's ambitious journey and transformation plans to deliver another high-quality facility as part of the ongoing regeneration of the site."

Latest Construction News

23/07/2026
GRAHAM has formally handed over the 321-studio St Vincent Studios purpose-built student accommodation to developer Artisan Real Estate, completing the £38m scheme in Glasgow city centre ahead of the 2026/27 academic year. The development on St Vincent Street was delivered by GRAHAM on behalf of Art
Read More
23/07/2026
SP Energy Networks has submitted a Section 37 consent application to the Scottish Government's Energy Consents Unit (ECU) for major upgrades to the electricity transmission network between Denny in Stirlingshire and Wishaw in Lanarkshire. Known as the Denny to Wishaw Network Upgrade (DWNO), the sch
Read More
23/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
23/07/2026
Scottish Renewables has opened entries for The Scottish Green Energy Awards 2026, inviting nominations across 12 categories ahead of a December ceremony in Edinburgh. Submissions close at 5pm on Tuesday 8 September. Nominations are open now for The Scottish Green Energy Awards 2026, billed as the U
Read More
23/07/2026
Scottish and Southern Electricity Networks (SSEN) has launched a pilot to upgrade domestic electricity connections, aiming to help households adopt cost-saving, low-carbon technologies more easily. The programme will initially deliver improvements for hundreds of customers as part of SSEN's broader
Read More
23/07/2026
Ferryhill Road is set to reopen by late August while SSEN Transmission pursues investigations on South College Street to fix a damaged duct; a further short closure of around four weeks will follow to complete cable installation and permanently reinstate the road. Traffic restrictions on Ferryhill
Read More
23/07/2026
The Engineering Construction Industry Training Board's (ECITB) Project Management Steering Group (PMSG) has unveiled a new e-learning academy to strengthen project management capability across the engineering construction industry (ECI). Hosted on ECITB's award-winning Learning Experience Platform
Read More
23/07/2026
Energy remains front of mind for many Glasgow firms, from controlling spend and tracking usage to meeting rising expectations on sustainability. In a conversation with the Glasgow Chamber of Commerce, Andrew Ward, CEO of Customer Business at ScottishPower, described the support on offer to help comp
Read More
22/07/2026
The £26m Grade A office at Dundee Waterfront, delivered by Robertson for Dundee City Council as part of the city's £1.6bn regeneration programme, has reached full occupation after global software firm N-able joined existing tenant Thorntons. Built by Robertson Construction Tayside, the six-storey J
Read More
22/07/2026
Ground has broken on a permanent spectator stand and team dugouts at the Meadowbank grass pitch at Kirkwall Grammar School (KGS). The project is fully funded by the Scottish Football Association and was proposed by the newly formed Orkney Football Hub, which brings together representatives from Ork
Read More
SEEIT3DBilanco Blinds LtdMcghee Training GroupCal-Due UK LimitedGarage Floors DirectInsulation Installers ScotlandElectrac NISOLV GROUPDryburgh Associates LimitedFyfe Brickwork