Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,933 companies....

Construction News

28/09/2021

New £60,000 Road Safety And Active Travel Project For A82

A new £60,000 road safety and active travel project is to be progressed on the A82 at Alltsigh with BEAR Scotland due to start works next week.

The project will involve the installation of approximately 80 metres of new footway adjacent to the northbound carriageway of the A82, between the forest access at the Great Glen Way to a point opposite the Lochside Hostel, greatly improving pedestrian access and safety. The new footway will also connect the northbound and southbound bus stops in Alltsigh providing safer access to public transport. In addition, works will also be undertaken to upgrade the drainage system, and new safety barriers and road signs will be installed in the area.

-- Advertisement --
NorthernAsbestosServicesLtd

The project is set to begin on Monday 04 October and is expected to take approximately six weeks to complete.

To ensure the safety of roadworkers and road users, temporary traffic lights and a 30mph speed limit will be in place for the duration of the project. Temporary pedestrian routing will also be implemented to maintain safe access through the site.

BEAR Scotland has engaged with all relevant stakeholders to inform them of the project and share information about the traffic management arrangements that will be in place to facilitate its construction.

Eddie Ross, BEAR Scotland's North West Representative, said: "Trunk Road safety is paramount at BEAR Scotland and this investment from Transport Scotland will improve pedestrian visibility and connectivity in this location for active travel and public transport users.

"The traffic management required to undertake these works is essential to keep everyone safe, so we encourage all road users to follow any signs or temporary arrangements that are put in place.

"Our teams will do all they can to complete the project as quickly and as safely as possible. We would like to thank road users in advance for their patience during this project and advise them to plan ahead by checking Traffic Scotland for up to date journey information and leave some extra time to reach their destination."

Latest Construction News

20/10/2026
Scotland's leading public sector framework provider has opened bidding for a £900 million Refurbishment and Modernisation programme aimed at delivering urgent and planned works across housing and public buildings. The Scottish Procurement Alliance's Refurbishment and Modernisation framework (RM4S)
Read More
20/10/2026
A £1 million grant programme has been launched to help owners return vacant listed buildings across Glasgow to productive use. The Heritage Building Viability Grant Scheme, funded by Glasgow City Council and administered by Glasgow City Heritage Trust, is designed to bring floorspace in some of the
Read More
20/10/2026
Road resurfacing on the A702 at West Linton will take place over six nights from Monday 9 to Friday 13 November, and on Monday 16 November 2026, requiring overnight closures. Transport Scotland's operating company, BEAR Scotland, will deliver the scheme. For safety, the A702 will be closed each ni
Read More
20/10/2026
SP Energy Networks chief executive Nicola Connelly has welcomed the launch of a new industry plan setting out how the biggest grid upgrade in living memory will boost employment and economic growth across the UK. The Electricity Networks Sector Growth Plan – led by the Energy Networks Association (
Read More
20/10/2026
An £8 million scheme is under way to enhance accessibility for passengers at Dalwhinnie and improve performance on the Highland Main Line. The project will install a new crossover so trains can switch between tracks, enabling northbound services to use Platform 1 when step-free access is required.
Read More
20/10/2026
The Scottish Government intends to award Wills Bros Civil Engineering Ltd the contract to dual the A9 between Pitlochry and Killiecrankie, Economy, Tourism and Transport Secretary Stephen Flynn has announced. The move represents the final stage of procurement for the fifth A9 Dualling scheme to rea
Read More
20/10/2026
Residents in Clackmannanshire are already benefiting from a new electric nine-seater minibus provided by Robertson Construction Central East, part of the contractor's social value commitments linked to the Wellbeing Village and Lochies School development in Alloa. During construction, the vehicle i
Read More
20/10/2026
A major new study will examine how climate change could trigger cascading disruption across Scotland's critical infrastructure, giving organisations a clearer view of risks to the services people rely on daily. Commissioned by the Climate Ready Infrastructure Scotland Forum (CRIS) — a partnership o
Read More
20/10/2026
Clark Contracts has secured a place on Pagabo's Major Works Framework, enhancing its ability to support public sector bodies in delivering major construction and refurbishment schemes. The framework, expected to be worth up to £5bn over four years, follows the creation of a 10-year strategic delive
Read More
20/10/2026
North Ayrshire Council has carried out its annual winter dry run this month as it gets ready for the colder months. Roads staff took part in the exercise as part of preparations to keep roads, footways and communities safe and accessible during severe weather. It follows a meeting of Cabinet at wh
Read More
SEEIT3DPro Vent ComplianceKelly TanksDiscount Kitchens and Bathrooms LtdDunedin Stone LtdMaterials Market UK Trading LtdForde Training Services LtdGreater Good Glass LtdCountryside KitchensDenfind Stone Limited