Build Scotland Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
13/12/2011

Modular Wiring Systems For Breeam Excellent Library

The University of Aberdeen’s new £57m library, which opened this September for students, staff and the general public, has been built using modular power and lighting distribution systems from Modular Wiring Systems, a subsidiary of electrical cable manufacturer Tratos Ltd.

The 15,500 sq m Library will cater for more than 16,000 students with over a quarter of a million books, maps and manuscripts, 1,200 reader spaces and cutting edge technology over eight storeys. Certified BREEAM Excellent -the foremost environmental assessment method and rating system for buildings - the Library is designed to minimise long term running costs and energy use.

As part of that commitment to environmental best practise, the Library has been constructed with Modular Wiring Systems’ prefabricated power and lighting distribution systems. As the systems are manufactured off site, there is no requirement for cutting and fabrication on site, thus reducing wastage, as well as improving quality control.

-- Advertisement --
NorthernAsbestosServicesLtd

The Modular Wiring systems have been installed throughout the building under the floors, feeding all power and lighting points, including the desks and lighting in the book cases themselves.

The high frequency, energy efficient lighting systems are DALI Controlled - a complete building-wide digital lighting control system built on the Digital Addressable Lighting Interface and Ethernet international standards. In order for the DALI system to work with the lighting in the book cases, Modular Wiring Systems designed and build bespoke product to ‘translate’ the DALI signal.

The lighting is controlled from a central desk and is zoned to allow lighting in specific areas to be changed.

Using Modular Wiring Systems’ distribution systems has provided the Library with exceptional flexibility, allowing desks to be moved and the layout altered, without the need to re wire to re route power. That’s because the systems feature easy to use plugs and sockets instead of hard wiring. Altering the systems simply involves unplugging the connections and re plugging into other connections, which is a quick and cost-effective approach and doesn’t require a high skill level.

Modular Wiring Systems is a leading company in this field and has been providing a complete design, manufacture and supply service for high and low level modular sub-circuit distribution systems prefabricated off-site since 1994.

(GK)

Latest Construction News

02/05/2024

Malin Group has secured planning permission in principle for its proposed development of the Scottish Marine Technology Park (SMTP). Malin Group's vision for the site is to deliver a state-of-the-art marine excellence hub which will bring together manufacturers with marine and renewables ...
02/05/2024

Fleming Building has officially broken ground on the development of the multi-million pound Bishopton Dargavel Satellite Facility. Working alongside Hub West Scotland and NHS Greater Glasgow & Clyde through a detailed pre-construction period, designs were developed to meet a range of requirements ...
02/05/2024

Aberdeenshire Council has announced the installation of a downstream defender as part of ongoing works to restore and improve the ponds at Denman Park in Westhill. The popular ponds in Denman Park are home to a wide variety of pondlife and wildlife but have been subject to pollution from a range ...
02/05/2024

Contractors RJ McLeod are on schedule to complete the construction of a new Largs seawall in North Ayrshire. The £4.6m project is almost complete with the northern section of the promenade expected to re-open to pedestrians before the summer season gets under way. The project has seen the ...
02/05/2024

Scottish Water has announced the successful completion of a major technological transformation of Glasgow's Victorian era Partick Pumping Station. Built some 120 years ago, the pumping station remains a key part of the city's waste water infrastructure and still serves 170,000 people. It is one of ...
02/05/2024

SSEN Transmission has committed to consider community and landowner proposed alignments as part of its Kintore-Tealing 400kV project. These alignments - which will be assessed in parallel with other alignment options within the refined routes SSEN Transmission recently consulted on - are around ...
02/05/2024

SSEN Distribution has announced that it has chosen Electron's 'ElectronConnect' platform to streamline and expand its procurement of Flexibility Services. The company's DSO Acceleration Action Plan identified the selection of a new Flexibility Market Platform during the Spring of 2024 as a key ...
02/05/2024

West Dunbartonshire Council has declared a housing emergency, highlighting the unprecedented pressures on the ability to meet the needs of those in social housing or seeking a Council property. Councillor Gurpreet Singh Johal, who is the Convener of Housing and Communities, made the declaration ...
02/05/2024

The Highland Council has submitted its response to the Scottish Government's consultation on Masterplan Consent Areas (MCA), developed by members of the Economy and Infrastructure Committee. The Scottish Government is proposing the introduction of discretionary powers to establish Masterplan ...
02/05/2024

As part of its ongoing efforts to improve biodiversity across the region, Perth and Kinross Council has announced an extension of its Grassland Management Trials, following successes at 42 other sites. These areas of longer grass will create space for nature and help attract bees, butterflies and ...
Morris & Spottiswood LtdRBT Underfloor LimitedThe Human Touch Scaffolding Co LtdBabbity EnvironmentalTHE HOME ARCHITECTToolstopCommercial Transmissions GroupQTS Training LtdFair City Precast LtdRural House Ltd
Terms and Conditions
2024/05/03 01:45:46