Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,795 companies....

Construction News

28/07/2025

Access Restrictions Begin For Kilmarnock's Palace Theatre Redevelopment

Construction News Image
Works are scheduled to begin shortly at the Palace Theatre in Kilmarnock, necessitating a number of access changes to facilitate a significant redevelopment project.

The refurbishment will transform the existing facilities into a state-of-the-art regional concert hall and theatre, with completion anticipated in early 2028.

From Monday, 4 August 2025, graphic hoardings will be installed around the site perimeter, and the underpass from London Road to the Burns Mall Shopping Centre will be closed as cleaning and repair works get underway. East Ayrshire Council is considering proposals for new steps and an accessible ramp to the rear entrance of the Burns Mall.
-- Advertisement --
NorthernAsbestosServicesLtd



To ensure public and contractor safety, the westbound side of the road and footway directly in front of the Palace Theatre will be closed for the duration of the project, with temporary traffic lights managing local traffic flow.

Sturrock Street East Car Park, immediately adjacent to the construction site, will also temporarily close from 4 August to accommodate site offices, welfare facilities, and provide controlled site access. This car park will remain closed for the duration of the works. Motorists are advised to use Titchfield Street Car Park, a short distance away, which operates under the same tariff.

East Ayrshire Council and East Ayrshire Leisure Trust will work closely with the appointed contractor, McLaughlin & Harvey, to minimise disruption during the works.

Latest Construction News

29/07/2025
Scotland's First Minister, John Swinney, has visited Eyemouth to officially mark the completion and full operational status of the nation's newest offshore wind farm, Neart na Gaoithe (NnG), translated as "Strength of the wind". During a tour of NnG's state-of-the-art operations and maintenance bas
29/07/2025
Sharkey, the Edinburgh-based construction services provider, has been appointed by Pointadvice Ltd to undertake the construction of four luxury townhouses in a prime location in St Andrews. The new three-storey residential development, replacing an existing 1960s dwelling, is situated immediately
29/07/2025
The Salamander Offshore Wind Farm, recognised as one of the most advanced floating wind projects in the UK, has achieved a critical milestone by securing its Section 36 Consent and associated Marine Licences from the Scottish Government. This approval gives the green light for the development and
29/07/2025
Roger Davis, an Associate with DM Hall, one of Scotland's largest independent Chartered Surveyors, has been shortlisted for the prestigious 2025 RICS Matrics Surveyor Awards. Mr Davis, from the firm's North East Residential Team based in Aberdeen, is a contender for the coveted Valuation Surveyor
29/07/2025
The Highland Council has announced plans to carry out essential road resurfacing works on Inshes Roundabout in Inverness. The project is scheduled to begin on Sunday, 17 August 2025, and will extend over six consecutive nights, with work taking place between 7pm and 6am to reduce impact on traffic
29/07/2025
The National Energy System Operator (NESO) has announced an extension to the notice period for the closure of its connections reform evidence portal. This decision, which provides a minimum of 10 days' notice for the Gate 2 portal closure, aims to better support energy projects, particularly those
28/07/2025
A £5.9 million project to install a new railway bridge at Bowling is now underway, a key step in unlocking the future development of the 150-acre former Exxon site. The bridge will create direct access to the expansive site, paving the way for industrial units, storage facilities, distribution cen
28/07/2025
Project partners have celebrated the groundbreaking of the new Corbiewood Primary School, a significant milestone for the emerging South Stirling Gateway housing development. This state-of-the-art, seven-classroom facility is being constructed by McLaughlin & Harvey through the SCAPE Scotland framew
28/07/2025
Works are scheduled to begin shortly at the Palace Theatre in Kilmarnock, necessitating a number of access changes to facilitate a significant redevelopment project. The refurbishment will transform the existing facilities into a state-of-the-art regional concert hall and theatre, with completion
28/07/2025
The iconic cupola of Bo'ness Town Hall has been fully restored in a £150,000 project commissioned by Falkirk Council, with works completed in June 2025. The restoration addressed extensive water damage and timber decay, reinstating the decorative structure's original appearance and ensuring its lo
THE HOME ARCHITECTCrown Street Lighting LtdSinclair Industries LtdTuffShopGlazing and Repairs Window and Door SpecialistsCreagh Concrete Products LtdHSEF (Health, Safety, Environmental & Fire Consultants)Safe Access (Highland) Ltd.Caledonia Crane Hire LtdNext Door Locksmith