Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,935 companies....

Construction News

14/12/2022

Ogilvie Construction Launches New Edinburgh Development

Ogilvie Construction has launched a major programme of works to transform an office building in the heart of Edinburgh's Exchange District.

Set to become Edinburgh's newest and greenest office development, 30 Semple Street will deliver 57,000 sq ft of much-needed Grade A office accommodation when it completes in May 2024.

• 30 Semple Street is targeting to become Edinburgh's greenest office development

• It will provide 57,000 sq ft of the highest specification office accommodation following its complete transformation

• Works include adding additional floors, new roof terraces and a new contemporary facade

• Situated in a rarely available location in Edinburgh's premier financial district

• Exceptional sustainability credentials, including being the first office building in Scotland to achieve a targeted BREEAM 'Outstanding' rating

Acting on behalf of CBRE Investment Management (CBREIM), Edinburgh's leading development management consultancy Corran Properties has appointed Ogilvie Construction to undertake the project.

Designed by Michael Laird Architects, the existing building (formerly known as Excel House) will be stripped back to its frame before two new floors are added as well as a stunning new 360⁰ contemporary façade.

The building has large and flexible floorplates, ranging from 6,867 sq ft – 8,040 sq ft across eight levels, all with an abundance of natural light and openable windows, and a new raised roof terrace with unimpeded views of Edinburgh Castle and the Edinburgh skyline.

The development is targeted to be the first in Scotland to achieve the highest BREEAM 'Outstanding' rating. It is also the first office development in Scotland to be awarded the new NABERS UK design accreditation for its environmental performance, and the first to secure Air Rated's coveted 'Platinum' accreditation which measures indoor air quality.  With sustainability embedded in the project from the outset, the building will achieve Net Zero Carbon operational status in accordance with the UK Green Building Council's framework definition.

-- Advertisement --
NorthernAsbestosServicesLtd

30 Semple Street provides several outstanding wellbeing amenities for occupiers including 85 bike spaces, stylish changing and showering facilities and on-site charging facilities for those arriving by electric vehicle. It also benefits from being situated in a unique location, in both the city centre close to Edinburgh's premier attractions and world class transport links, and in a prime position in the city's thriving Exchange District.

Nick Ball, Managing Director of Corran Properties commented: "We were delighted to be appointed by CBREIM in 2020 to undertake this transformational development. I hope we have re-paid their faith with the exceptional quality that is now being delivered. Office design is moving towards a more sustainable future so from the outset the focus has been to achieve the highest environmental goals possible, and this has resulted in a number of firsts for 30 Semple Street. 

"To achieve the leading sustainability credentials alongside the outstanding facilities for staff and flexible, modern workspace we're delivering for 30 Semple Street, the solution in the past would have been to demolish and start again. However, by retaining the original structure, we've saved 3,300 tons of CO2, more than 50% of the carbon in reconstruction. The new building will operate with net zero carbon emissions and sets a very high new benchmark, not only in Edinburgh but further afield too."

Alix Mills, Senior Director at CBRE Investment Management, added: "The current demand for high quality Grade A office space in Edinburgh gave us the confidence to invest in a significant redevelopment project at 30 Semple Street. We are excited by the plans that align with CBREIM's ESG ambitions and look forward to seeing the new and improved building take shape as the works progress."

As well as Ogilvie Construction and Michael Laird Architects, the experienced project team includes mechanical and electrical engineering consultancy KJ Tait, project management and cost consultancy Axiom Project Services, structural and civil engineering consultancy Blyth & Blyth and Atelier Ten as fire engineering consultants. CuthbertWhite and Knight Frank have been appointed as letting agents.

Chris Cuthbert from CuthbertWhite said: "When it completes in May 2024, 30 Semple Street will be the best accredited building in Edinburgh's office market, at a time when prime Grade A office space is in short supply. The building has stature, prominence and is in a truly enviable location. We know that occupiers are becoming more discerning with their requirements and expect something more, particularly when attracting their staff to the office. 30 Semple Street has been exceptionally well conceived from a design point of view, raising the bar across Scotland."

Toby Withall from Knight Frank added: "Edinburgh currently has a severe supply shortage with no new office development under construction that isn't already pre-let. 30 Semple Street will undoubtedly capitalise on this lack of supply and the building's strong environmental credentials, flexible floorplates and rarely available location in the Exchange, will ensure it attracts a great deal of interest from occupiers with active requirements."

Latest Construction News

21/10/2026
Senior figures from Great British Energy are currently in Shetland until 22 October to meet island leaders, businesses and community groups, and to hear first-hand about local energy opportunities and challenges. The delegation, headed by CEO Dan McGrail and Chair Juergen Maier, will focus on commu
Read More
21/10/2026
North Ayrshire Council has secured funding to press ahead with demolishing the structurally unsafe Valefield pedestrian bridge in Kilbirnie. A funding commitment from the Scottish Government, working in partnership with Walk Wheel Cycle Trust, will enable the bridge to be removed, with plans alread
Read More
21/10/2026
SSE has named Aberdeen-based Seaway7, part of the Subsea7 group, as preferred supplier for the Engineering, Procurement, Construction and Installation (EPCI) scope on its 1.4GW Berwick Bank B offshore wind project, a move expected to support 465 UK jobs, including 400 in Scotland. The agreement li
Read More
21/10/2026
An Inverness electrician has been named Scottish Joint Industry Board (SJIB) Apprentice of the Year 2026 in recognition of her technical skills, professionalism and commitment to the electrical industry. Katie Munro, 25, who works for SELECT member firm Ross-Shire Engineering (RSE) Ltd, won the top
Read More
21/10/2026
Overnight closures will take place on the A1 at Wallyford from Monday 2 November, as BEAR Scotland carries out resurfacing on behalf of Transport Scotland. Work is scheduled over five nights between 20:30 and 06:00, with completion expected by 06:00 on Saturday 7 November. The scheme will repair d
Read More
21/10/2026
Queen Margaret University (QMU) has submitted a planning application for a new solar energy scheme at its Musselburgh campus, which could generate around a quarter of the university’s annual electricity requirements. The proposed development forms part of QMU’s wider sustainability programme and wo
Read More
21/10/2026
Highlands and Islands Enterprise (HIE) has welcomed the official launch of the UK’s first high-voltage direct current (HVDC) subsea cable factory at the Port of Nigg in Easter Ross. The £350 million facility will be key to expanding the UK's electricity transmission network and enabling the efficie
Read More
21/10/2026
When people see the glitz and glamour of casinos on the surface, there's a whole lot of other things going on beneath the surface to ensure that everyone has a nice time. The modern casino floor is one of the most carefully engineered rooms on earth, all the way down to the playing chips. In Decemb
Read More
21/10/2026
Glasgow Chamber of Commerce, supported by Developing the Young Workforce (DYW) Glasgow, has launched the third phase of its industry-led Construction Aware programme following a £3,000 investment from delivery partner RJ McLeod. The firm is the first business to invest directly in the initiative,
Read More
21/10/2026
The eastbound on-slip to the M8 at Junction 3 in Livingston will be closed from 20:30 to 06:00 on Monday 9 November 2026 while Transport Scotland’s operating company, BEAR Scotland, undertakes painting inspection works on two bridges over the motorway. A signed diversion will direct drivers seeking
Read More
SEEIT3DStuart King Architecture & Design LtdNew Home Quality ControlRural House LtdJames Macqueen Building Contractors LtdHodge Plant LimitedNick Ives JoineryListers Concrete PumpingADAM Roofing Services GlasgowCarla MacKay Interiors