Dundee City Council has announced the successful completion of works to construct a new salt barn, designed to reduce wastage and boost green energy.
The barn, at the council's Marchbanks depot, holds up to 5500 tonnes of road salt for use across the city's roads and pavement network, and this year for the first time two of its main cycle routes.
Completed in time for the worst winter storms, local contractor Kilmac provided the steel portal frame, supplied and erected precast concrete wall units, carried out groundworks and installed the roof-mounted photovoltaic panels system.
Mark Flynn convener of Dundee City Council's city development committee said: "Protecting our winter maintenance stocks in this dual-purpose building not only means we can be more cost-effective, it is also now generating clean energy that contributes to charging the council's ever-expanding fleet of electric gritters and road sweepers.
"Safe active travel, as well as for vehicles, is key to keeping the city moving in the worst winters, and although we don't know what is around the corner, it is prudent to be adequately prepared."
This month sees the start of winter maintenance operations on 15km of the National Cycle Network (NCN) Routes 1 and 77 within Dundee City Council's boundaries.
A specialist gritting vehicle, narrow enough to tackle the limited width of the cycleway and fully electric, is being brought in specifically for the task. In addition, a pair of remote weather sensors have been installed at key points on the route to provide accurate condition updates.
Construction News
18/10/2022
New Green Energy Salt Barn Prepares Dundee For Winter


06/05/2025
A total of 125 new homes are planned for the second phase of Glasgow's Athletes' Village, following a decision by Glasgow City Council to vary the development agreement with the City Legacy consortium. This change will see Cruden build 67 homes for sale, while CCG will construct 58 homes for social

06/05/2025
Construction work has commenced on the transformation of the former Motherwell Town Hall into 20 modern council homes for North Lanarkshire Council.
The refurbishment project, located in the heart of Motherwell, will involve the partial demolition of the vacant former Zone building while carefully

06/05/2025
Tilbury Douglas has secured a new five-year framework agreement with The Royal Edinburgh Military Tattoo to continue the annual construction and delivery of the event's renowned temporary stadium.
This new contract award follows Tilbury Douglas's successful delivery of the stadium infrastructure fo

06/05/2025
Aberdeen City Council is spearheading an ambitious bid to establish a "hydrogen valley" in the North East of Scotland, aiming to integrate hydrogen production, storage, and various end-use applications. The project, named TH2ISTLE, is seeking £7.7 million in funding from the Clean Hydrogen Partnersh

06/05/2025
SSEN Transmission is continuing with permitted ground investigation activities along the proposed routes for its three new onshore overhead line projects, which form a critical part of its £20 billion ‘Pathway to 2030' programme. This work is essential for gathering detailed information to ensure re

06/05/2025
Over £8 million in funding is being made available to communities across the North East of Scotland and Moray to stimulate job creation in low carbon industries and enhance green and net zero skills. The Scottish Government's Just Transition Fund (JTF) is reopening for applications for the first tim

06/05/2025
The UK's inaugural hydrogen training centre for Gas Safe registered engineers has officially opened at Fife College's Levenmouth Campus, a joint initiative between the college and gas distribution company SGN.
The new facility is set to train over 100 gas engineers this year, equipping them with th

06/05/2025
The Scottish and Northern Ireland Plumbing Employers’ Federation (SNIPEF) Technical Team, along with members and affiliates, visited SeaWarm in South Queensferry last week to gain insights into their innovative water-source heat pump system that utilises sea water.
SeaWarm's technology involves dra

06/05/2025
Highlands and Islands Enterprise (HIE) has lodged an application for planning permission in principle to facilitate the second and final phase of development at Inverness Campus. The application primarily seeks permission to establish essential infrastructure, including roads and utilities, which wi

06/05/2025
Network Rail engineers are set to commence a £2.1 million project this month to completely renew platform 2 at Hamilton West train station. The significant upgrade will involve the demolition and reconstruction of the platform, incorporating improved surfacing, enhanced drainage, and tactile paving