Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,935 companies....

Construction News

08/03/2022

Draft City Centre Transformation Plan Announced For Glasgow

Glasgow City Council has announced a draft City Centre Transformation Plan (CCTP) for 2022-32, that allows the delivery of an 'integrated, healthy, inclusive and sustainable transport network for the city centre', with increased connectivity and capacity.

The Council said that the CCTP has a 'people-based focus', addressing the needs of place and movement and the additional vitality and vibrancy that well connected, safe and appealing places create. Underpinning this is the Sustainable Travel Hierarchy, with its promotion of walking, cycling, public transport and bike, car and ride sharing in preference to single-occupancy car use.

The strategy looks to re-balance the use of Glasgow city centre streets and public spaces by re-purposing road space policy, spatial and project initiatives, with all the project elements intended to be complimentary and delivered on a phased basis.

The CCTP is expected to bring key benefits in terms of improved place quality and economic vibrancy, assisting the transition to net-zero, improving residents' health, well-being and quality of life and an enhanced quality of experience for visitors to the city centre as the area's streets will be cleaner, greener and less congested.

The CCTP is an update of the existing City Centre Transport Strategy, and a six-week consultation on the Plan will begin in May, after the local government elections.

The CCTP will play a key role in ensuring that transport plans for the city centre help deliver the aims shared by a number of other strategies to ensure that the area is attractive for residents, workers, students, businesses, visitors and investors.

The process of updating Glasgow's transport strategies has primarily been informed by the findings of 2020's public engagement on future transport in the city, with almost 3,000 responses indicating a general recognition of the need for change, and some notable findings for the city centre, including:

-- Advertisement --
NorthernAsbestosServicesLtd

• 81% supported road-space being re-allocated to Walking Wheeling & Public Transport:

• 77% supported that People and place are prioritised in the city centre: and

• 60% of respondents said they would consider leaving their car at home more for shorter journeys and walking or cycling instead.

As a result, and following further engagement with internal and external groups at workshops on the CCTP in late 2021, the purpose of the City Centre Transformation Plan is to provide a clear framework for transport decision-making in Glasgow city centre, with the following key aims:

• The re-allocation of road space in the city centre for active travel and green infrastructure;

• The delivery of improved public transport and support/encourage a shift to more sustainable modes, particularly walking, cycling and public transport, with a target of 80% of peak-time travel to the city centre being made by active travel and public transport by 2030;

• Improved access for the mobility-impaired;

• Seeking to achieve a 30% reduction in peak-hour private car traffic in the city centre by 2030;

• The delivery of improvements for servicing (e.g. goods, deliveries and waste collection) to improve the vitality of Glasgow city centre;

• Supporting a doubling of Glasgow city centre's population by 2035; and

• Supporting Glasgow's aim to be carbon neutral by 2030.

In policy terms, the CCTP will have a number of aims around traffic demand management, particularly at peak times; public transport integration; environmental management through measures as encouraging electric vehicle fleets; parking space management; and advancing change through the planning system to deliver SMART city technologies, EV charging, and secure Services-Freight Hubs.

Core spatial aims for the CCTP are a more accessible city centre, where the place becomes somewhere that all users with limited or restricted mobility are able to enjoy safe and ready access; a place where walking should be the main way of travelling around the city centre, and where more people choose to cycle into and around it. Other aims for the city include cleaner, greener and less congested streets; a place where public transport is efficient, reliable and integrated; and where goods are moved and delivered efficiently and sustainably.

A number of confirmed and aspirational projects will help deliver the aims of the CCTP, including George Square and the wider Avenues and Avenues Plus programme; the High Street corridor; the transformation of the Broomielaw and Clyde Waterfront; people-friendly streets; the proposed Mitchell Plaza and Charing Cross scheme; the Buchanan Street gateway; and a People First Zone in the city centre - a people-friendly low vehicular access area.

The latter proposal - bounded by Hope Street, Cowcaddens Road, North Hanover / Glassford Street and Howard Street - would see the creation of an area of high-quality public realm where people are able to easily and safely walk and wheel around, and where feel that they - and not vehicles - have priority. In the People First Zone, crossing points would be much wider and pedestrians will have less distance and more time to cross the road in an environment that feels much more pleasant with less noise and cleaner air. While access would still be available for pick up and drop off at the key transport hubs and disabled access would be maintained, the creation of this zone would enable the space to be re-purposed for other purposes such as fully integrated active travel provision, civic spaces, pocket parks or parklets and street cafes. If the proposal was approved, it would be delivered on a phased basis and completed by 2027. The zone would tie in with the proposed Masterplans for the Buchanan Galleries and St Enoch Centre.

Latest Construction News

21/10/2026
Senior figures from Great British Energy are currently in Shetland until 22 October to meet island leaders, businesses and community groups, and to hear first-hand about local energy opportunities and challenges. The delegation, headed by CEO Dan McGrail and Chair Juergen Maier, will focus on commu
Read More
21/10/2026
North Ayrshire Council has secured funding to press ahead with demolishing the structurally unsafe Valefield pedestrian bridge in Kilbirnie. A funding commitment from the Scottish Government, working in partnership with Walk Wheel Cycle Trust, will enable the bridge to be removed, with plans alread
Read More
21/10/2026
SSE has named Aberdeen-based Seaway7, part of the Subsea7 group, as preferred supplier for the Engineering, Procurement, Construction and Installation (EPCI) scope on its 1.4GW Berwick Bank B offshore wind project, a move expected to support 465 UK jobs, including 400 in Scotland. The agreement li
Read More
21/10/2026
An Inverness electrician has been named Scottish Joint Industry Board (SJIB) Apprentice of the Year 2026 in recognition of her technical skills, professionalism and commitment to the electrical industry. Katie Munro, 25, who works for SELECT member firm Ross-Shire Engineering (RSE) Ltd, won the top
Read More
21/10/2026
Overnight closures will take place on the A1 at Wallyford from Monday 2 November, as BEAR Scotland carries out resurfacing on behalf of Transport Scotland. Work is scheduled over five nights between 20:30 and 06:00, with completion expected by 06:00 on Saturday 7 November. The scheme will repair d
Read More
21/10/2026
Queen Margaret University (QMU) has submitted a planning application for a new solar energy scheme at its Musselburgh campus, which could generate around a quarter of the university’s annual electricity requirements. The proposed development forms part of QMU’s wider sustainability programme and wo
Read More
21/10/2026
Highlands and Islands Enterprise (HIE) has welcomed the official launch of the UK’s first high-voltage direct current (HVDC) subsea cable factory at the Port of Nigg in Easter Ross. The £350 million facility will be key to expanding the UK's electricity transmission network and enabling the efficie
Read More
21/10/2026
When people see the glitz and glamour of casinos on the surface, there's a whole lot of other things going on beneath the surface to ensure that everyone has a nice time. The modern casino floor is one of the most carefully engineered rooms on earth, all the way down to the playing chips. In Decemb
Read More
21/10/2026
Glasgow Chamber of Commerce, supported by Developing the Young Workforce (DYW) Glasgow, has launched the third phase of its industry-led Construction Aware programme following a £3,000 investment from delivery partner RJ McLeod. The firm is the first business to invest directly in the initiative,
Read More
21/10/2026
The eastbound on-slip to the M8 at Junction 3 in Livingston will be closed from 20:30 to 06:00 on Monday 9 November 2026 while Transport Scotland’s operating company, BEAR Scotland, undertakes painting inspection works on two bridges over the motorway. A signed diversion will direct drivers seeking
Read More
SEEIT3DWT ConsultancyDonnelly Safety ServicesCTW Safety LTDBusiness Solutions (SW) LTD123vNormac Oils LtdRox ElectricalCaledonia Crane Hire LtdPAUL Heat Recovery