Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,935 companies....

Construction News

11/02/2022

Scottish Water Announces Completion Of Large-Scale Battery Storage Project

Scottish Water has announced that work has been completed on the first large-scale battery storage project, accelerating their drive towards net zero emissions by 2040.

The flagship scheme, delivered by framework contractor Absolute Solar & Wind Ltd, is part of a £2 million renewables project which includes the company's largest single solar energy array to date.

Four vanadium flow batteries, manufactured by Invinity Energy Systems, have recently been installed at the waste water treatment works that serve the city of Perth. The batteries are capable of storing up to 0.8 megawatt hours (MWh) of energy and will be used to store power generated from more than 2,520 solar panels, with a combined output of over 1 megawatt (MW).

By enabling solar energy to be used at any time of the day or night, the battery system will allow around 94% of the renewable power generated to be used on site – a significant step forward in the company's decarbonisation ambitions.

By combining battery storage and solar power, the carbon footprint of the treatment works will be cut by around 160 tonnes of CO2 per annum – the equivalent of offsetting 580,000 miles from the average passenger car. The scheme will also help to power the utility's first rapid electric vehicle charging points which have been installed at the site; and will reduce energy costs of the treatment works by approximately 40%.

This installation is the latest investment by Scottish Water Horizons, the public utility's commercial subsidiary, who are developing a programme of opportunities for battery storage across Scottish Water's asset portfolio.

Scottish Water Horizons Business Development Manager, Donald MacBrayne, said: "We're excited to have our first battery facility up and running to help reduce emissions and tackle climate change. The ability to maximise green energy production as well as store and release this energy when we need it is a vital part of our journey to net zero.

-- Advertisement --
NorthernAsbestosServicesLtd

"By harnessing this technology, we now have a much wider opportunity to install renewables schemes that were previously unviable due to grid constraints. It's a massive step forward for us and will form an integral part of how we cut our emissions in the coming years.

"It's fantastic news for the customers in Perth as they can now benefit from a treatment service with a significantly lower carbon footprint, helping them with their ambition to become the most sustainable small city in Europe."

The utility-grade vanadium flow batteries were assembled by Invinity Energy Systems at their manufacturing and assembly facility in West Lothian. Invinity's patented vanadium flow battery technology is already making its mark in the energy storage market world-wide as a safer, more durable and sustainable alternative to traditional lithium-ion batteries.

Matt Harper, Chief Commercial Officer at Invinity Energy Systems, said: "We are very proud to be supporting the decarbonisation of essential public infrastructure in the UK. Utility-grade energy storage, such as our vanadium flow batteries, has a key role to play in unlocking the low-cost, low-carbon energy we require to reach net zero, while helping to shield companies from rising commercial energy prices."

A key component to the success of the battery and solar hybrid scheme is the intelligent battery software and control system that coordinates the production, storage and release of the energy generated. The digital optimisation platform, Dynamic Demand 2.0, supplied and installed by Open Energi, provides a steady supply of energy during periods of low renewable generation whilst keeping energy costs down.

David Hill, Chief Commercial Officer, Open Energi said: "Open Energi are thrilled to be part of such a pioneering project. The use of vanadium flow storage enables Scottish Water to soak up a greater proportion of their on-site solar generation when compared to conventional lithium-ion storage. Our micro-grid optimisation tool, which uses highly localised solar, demand and wholesale energy price forecasting capabilities, ensures not a single drop of sun's energy is wasted.

"When you look at the recent surge in power prices, driven by high gas prices, we see this type of 'Energy as a Service' proposition, which bundles zero carbon technology into a simple value proposition, becoming the norm for all energy consumers."

The battery project in Perth joins a long list of renewables schemes already installed at many treatment works and other Scottish Water assets across Scotland.

Renewable energy experts Absolute Solar and Wind delivered the onsite solar scheme earlier this year whilst adhering to ongoing Covid guidance.

Scottish Water has committed to reach net zero carbon emissions by 2040 with an interim target to host or self-generate three times its annual electricity consumption by 2030. Almost 80 of the company's water and waste water treatment works are now either self-sufficient or partly sufficient in their power requirements.

Latest Construction News

21/10/2026
Senior figures from Great British Energy are currently in Shetland until 22 October to meet island leaders, businesses and community groups, and to hear first-hand about local energy opportunities and challenges. The delegation, headed by CEO Dan McGrail and Chair Juergen Maier, will focus on commu
Read More
21/10/2026
North Ayrshire Council has secured funding to press ahead with demolishing the structurally unsafe Valefield pedestrian bridge in Kilbirnie. A funding commitment from the Scottish Government, working in partnership with Walk Wheel Cycle Trust, will enable the bridge to be removed, with plans alread
Read More
21/10/2026
SSE has named Aberdeen-based Seaway7, part of the Subsea7 group, as preferred supplier for the Engineering, Procurement, Construction and Installation (EPCI) scope on its 1.4GW Berwick Bank B offshore wind project, a move expected to support 465 UK jobs, including 400 in Scotland. The agreement li
Read More
21/10/2026
An Inverness electrician has been named Scottish Joint Industry Board (SJIB) Apprentice of the Year 2026 in recognition of her technical skills, professionalism and commitment to the electrical industry. Katie Munro, 25, who works for SELECT member firm Ross-Shire Engineering (RSE) Ltd, won the top
Read More
21/10/2026
Overnight closures will take place on the A1 at Wallyford from Monday 2 November, as BEAR Scotland carries out resurfacing on behalf of Transport Scotland. Work is scheduled over five nights between 20:30 and 06:00, with completion expected by 06:00 on Saturday 7 November. The scheme will repair d
Read More
21/10/2026
Queen Margaret University (QMU) has submitted a planning application for a new solar energy scheme at its Musselburgh campus, which could generate around a quarter of the university’s annual electricity requirements. The proposed development forms part of QMU’s wider sustainability programme and wo
Read More
21/10/2026
Highlands and Islands Enterprise (HIE) has welcomed the official launch of the UK’s first high-voltage direct current (HVDC) subsea cable factory at the Port of Nigg in Easter Ross. The £350 million facility will be key to expanding the UK's electricity transmission network and enabling the efficie
Read More
21/10/2026
When people see the glitz and glamour of casinos on the surface, there's a whole lot of other things going on beneath the surface to ensure that everyone has a nice time. The modern casino floor is one of the most carefully engineered rooms on earth, all the way down to the playing chips. In Decemb
Read More
21/10/2026
Glasgow Chamber of Commerce, supported by Developing the Young Workforce (DYW) Glasgow, has launched the third phase of its industry-led Construction Aware programme following a £3,000 investment from delivery partner RJ McLeod. The firm is the first business to invest directly in the initiative,
Read More
21/10/2026
The eastbound on-slip to the M8 at Junction 3 in Livingston will be closed from 20:30 to 06:00 on Monday 9 November 2026 while Transport Scotland’s operating company, BEAR Scotland, undertakes painting inspection works on two bridges over the motorway. A signed diversion will direct drivers seeking
Read More
SEEIT3DElectrac NISOLV GROUPDryburgh Associates LimitedFyfe BrickworkInverness Core Drilling LtdStuart King Architecture & Design LtdNew Home Quality ControlRural House LtdJames Macqueen Building Contractors Ltd