Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,933 companies....

Construction News

24/01/2023

MBA Seeking Volunteers For Bothy-Build Renovation

The Mountain Bothy Association (MBA) is seeking volunteers interested in bothy-building for an opportunity to learn while assisting with the renovation of a disused building, Druimnashallag.

Licensed to the MBA by land manager Forestry and Land Scotland's West Region team, the building, located south east of Oban and north of Lochgilphead, was built in 1891 but was last occupied around 70 years ago. It was slowly falling into ruin and faced the threat of demolition until its potential as a bothy was spotted by the FLS.

Raymond Mundie, FLS' Area Land Agent, said: "Until recently it had been hidden away in the middle of a forest but recent felling work opened up the ground to the north and led to the building's 're-discovery'.

"It's a fairly characterful old building and although it hasn't been used in decades, it was still fairly structurally sound.

"We didn't see that we could make any use of it and it would have ended up being demolished because it presented a potential risk to members of the public, especially if it was left to fall into further disrepair.

-- Advertisement --
NorthernAsbestosServicesLtd

"However, given that it was still reasonably sound it seemed a shame to demolish it. We decided to offer it to the MBA and they were more than happy to take it on."

With planning permission in place and the building warrant being progressed with the local authority, the MBA has already drawn up plans of the work needing to done.

Peter Rowell for the MBA, said: "The walls are mostly in good condition although but a couple of sections will need to be rebuilt from new foundations up to the wall heads. A new roof, a new floor, windows and door will be installed before the internal conversion can begin. The plan is to have two internal rooms, each with an open fire and sleeping platform, a central porch and a separate byre for firewood, bicycles etc.

"We expect to begin work in the spring 2023 but it is a phased project over two-years and we'll be looking to have 10 or 12 volunteers at any onetime to help out over that time. We don't expect anyone to be there for all the phases but rather for a few days or maybe a week or two at a time.

"Anyone with construction skills or basic DIY would be great but even if you have no skills of this type - yet – we'll still be able to put you to good use.

"It's a bit out of the way – as you would expect for a bothy. The nearest shop is 7 miles away, mobile phone reception isn't great and there's no telling what the weather will be like but if this sounds like your ideal project, get in touch."

The byre roof will be designed and constructed to encourage bats and owls to take up residence.

The first batch of materials is to be delivered to site in March/April. Camping spaces, a toilet and shower will be built, as well as a small canteen and will be built to offer basic refreshments for volunteers.

Anyone who is keen to find out more and potentially sign-up to lend a hand should contact [email protected] who will send out a copy of the latest volunteer brief that contains more details on the project.

The MBA web site will be the primary source of details for the dates and details during the two year construction phase.

Latest Construction News

20/10/2026
Scotland's leading public sector framework provider has opened bidding for a £900 million Refurbishment and Modernisation programme aimed at delivering urgent and planned works across housing and public buildings. The Scottish Procurement Alliance's Refurbishment and Modernisation framework (RM4S)
Read More
20/10/2026
A £1 million grant programme has been launched to help owners return vacant listed buildings across Glasgow to productive use. The Heritage Building Viability Grant Scheme, funded by Glasgow City Council and administered by Glasgow City Heritage Trust, is designed to bring floorspace in some of the
Read More
20/10/2026
Road resurfacing on the A702 at West Linton will take place over six nights from Monday 9 to Friday 13 November, and on Monday 16 November 2026, requiring overnight closures. Transport Scotland's operating company, BEAR Scotland, will deliver the scheme. For safety, the A702 will be closed each ni
Read More
20/10/2026
SP Energy Networks chief executive Nicola Connelly has welcomed the launch of a new industry plan setting out how the biggest grid upgrade in living memory will boost employment and economic growth across the UK. The Electricity Networks Sector Growth Plan – led by the Energy Networks Association (
Read More
20/10/2026
An £8 million scheme is under way to enhance accessibility for passengers at Dalwhinnie and improve performance on the Highland Main Line. The project will install a new crossover so trains can switch between tracks, enabling northbound services to use Platform 1 when step-free access is required.
Read More
20/10/2026
The Scottish Government intends to award Wills Bros Civil Engineering Ltd the contract to dual the A9 between Pitlochry and Killiecrankie, Economy, Tourism and Transport Secretary Stephen Flynn has announced. The move represents the final stage of procurement for the fifth A9 Dualling scheme to rea
Read More
20/10/2026
Residents in Clackmannanshire are already benefiting from a new electric nine-seater minibus provided by Robertson Construction Central East, part of the contractor's social value commitments linked to the Wellbeing Village and Lochies School development in Alloa. During construction, the vehicle i
Read More
20/10/2026
A major new study will examine how climate change could trigger cascading disruption across Scotland's critical infrastructure, giving organisations a clearer view of risks to the services people rely on daily. Commissioned by the Climate Ready Infrastructure Scotland Forum (CRIS) — a partnership o
Read More
20/10/2026
Clark Contracts has secured a place on Pagabo's Major Works Framework, enhancing its ability to support public sector bodies in delivering major construction and refurbishment schemes. The framework, expected to be worth up to £5bn over four years, follows the creation of a 10-year strategic delive
Read More
20/10/2026
North Ayrshire Council has carried out its annual winter dry run this month as it gets ready for the colder months. Roads staff took part in the exercise as part of preparations to keep roads, footways and communities safe and accessible during severe weather. It follows a meeting of Cabinet at wh
Read More
SEEIT3DLothian Bricklaying ServicesOptimo Waste LTDModern Roofing Scotland LtdWasteMan LTDRRS GroundworksGlazing and Repairs Window and Door SpecialistsBaseline Contracts LTDTHE HOME ARCHITECTWT Consultancy