Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,933 companies....

Construction News

02/09/2022

Stirling Council Approves Biomethane Plant Development

Stirling Council's Planning and Regulation Panel have approved a proposal for a new biomethane plant near Kippen.

Graham's, the Family Dairy, are seeking to install the facility on a 1.9 hectare site north east of Mains of Boquhan as part of their plans to achieve net zero by 2035.

The proposal would see dairy and agricultural waste from three of Graham's sites broken down through an anaerobic digestion process to produce biomethane and digestate – a nutrient-rich substance.

The biomethane would provide a renewable source of heat for soft cheese production and a fuel replacement for Heavy Goods Vehicles, while the digestate would be used on an adjoining farm owned in place of fossil fuel derived fertiliser.

-- Advertisement --
NorthernAsbestosServicesLtd

The development includes digester tanks, a plant room and a number of other structures, including absorption towers, a flare and a digestate store surrounded by a 3m high wall.

Alterations would also be made to the junction where the existing road meets the A811.

In a report submitted to the Planning Panel, Council Officers stated that the proposal complies with Stirling's Local Development Plan.

Following a hearing at Tuesday's (30 Aug) meeting, in which objectors spoke, the application was approved, subject to a number of conditions.

These included: a pre-construction noise impact assessment, limits on when HGVs can move at the site, a restriction of the operation of the flare stack to a maximum of 10 minutes per month, a road safety audit and the approval of management plans relating to lighting, noise, dust and the environment.

A total of 97 objections were lodged about the application, including from Kippen and Gargunnock Community Councils, out of 103 comments received. These were considered when applying the conditions.

Questions were asked by the panel over SEPA's regulatory responsibilities, in relation to the environmental impact of the plant. Responses were considered in determining the application.

Latest Construction News

20/10/2026
Scotland's leading public sector framework provider has opened bidding for a £900 million Refurbishment and Modernisation programme aimed at delivering urgent and planned works across housing and public buildings. The Scottish Procurement Alliance's Refurbishment and Modernisation framework (RM4S)
Read More
20/10/2026
A £1 million grant programme has been launched to help owners return vacant listed buildings across Glasgow to productive use. The Heritage Building Viability Grant Scheme, funded by Glasgow City Council and administered by Glasgow City Heritage Trust, is designed to bring floorspace in some of the
Read More
20/10/2026
Road resurfacing on the A702 at West Linton will take place over six nights from Monday 9 to Friday 13 November, and on Monday 16 November 2026, requiring overnight closures. Transport Scotland's operating company, BEAR Scotland, will deliver the scheme. For safety, the A702 will be closed each ni
Read More
20/10/2026
SP Energy Networks chief executive Nicola Connelly has welcomed the launch of a new industry plan setting out how the biggest grid upgrade in living memory will boost employment and economic growth across the UK. The Electricity Networks Sector Growth Plan – led by the Energy Networks Association (
Read More
20/10/2026
An £8 million scheme is under way to enhance accessibility for passengers at Dalwhinnie and improve performance on the Highland Main Line. The project will install a new crossover so trains can switch between tracks, enabling northbound services to use Platform 1 when step-free access is required.
Read More
20/10/2026
The Scottish Government intends to award Wills Bros Civil Engineering Ltd the contract to dual the A9 between Pitlochry and Killiecrankie, Economy, Tourism and Transport Secretary Stephen Flynn has announced. The move represents the final stage of procurement for the fifth A9 Dualling scheme to rea
Read More
20/10/2026
Residents in Clackmannanshire are already benefiting from a new electric nine-seater minibus provided by Robertson Construction Central East, part of the contractor's social value commitments linked to the Wellbeing Village and Lochies School development in Alloa. During construction, the vehicle i
Read More
20/10/2026
A major new study will examine how climate change could trigger cascading disruption across Scotland's critical infrastructure, giving organisations a clearer view of risks to the services people rely on daily. Commissioned by the Climate Ready Infrastructure Scotland Forum (CRIS) — a partnership o
Read More
20/10/2026
Clark Contracts has secured a place on Pagabo's Major Works Framework, enhancing its ability to support public sector bodies in delivering major construction and refurbishment schemes. The framework, expected to be worth up to £5bn over four years, follows the creation of a 10-year strategic delive
Read More
20/10/2026
North Ayrshire Council has carried out its annual winter dry run this month as it gets ready for the colder months. Roads staff took part in the exercise as part of preparations to keep roads, footways and communities safe and accessible during severe weather. It follows a meeting of Cabinet at wh
Read More
SEEIT3DNormac Oils LtdRox ElectricalCaledonia Crane Hire LtdPAUL Heat RecoveryAdvanced Window FilmsCommercial Transmissions GroupCorsehouse Commercials LtdPentland Building & JoineryWestermans International Ltd