Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,933 companies....

Construction News

06/07/2010

£2.5m Road Repair Programme Set To Begin

A £2.5million programme of road repair work in Aberdeen is about to get under way.

The work, which will include resurfacing roads, repairing pavements, drainage systems and replacing street lighting columns, is being paid for using savings from the Marischal College project.

The budget has been split and will provide:

  • £1,850,000 worth of road and carriageway repairs on streets which were badly damaged by the severe weather;
  • £250,000 of drainage repairs to tackle the problem of water flowing between the blacktop layers of carriageway, which results in much of the damage to road surfaces;
  • £200,000 of footpath works which will be targeted at footpaths classed as bad;
  • £200,000 of street lighting improvements to replace lighting columns which are beyond their design life.
All new street lights are being designed with energy reduction as a main consideration, so reducing the energy bill.

The works are in addition to the 2010/11 capital programme set out in this year's budget, which include resurfacing the northbound carriageway of Ellon Road and repairing the Queen Elizabeth Bridge.

-- Advertisement --
NorthernAsbestosServicesLtd

Several roads will be resurfaced using the money diverted from the Marischal College contingency fund and the original capital budget, including: Wellington Road northbound from Craigshaw Road to the Balnagask Road junction; Wellington Road southbound from Greenbank Road to Craigshaw Drive; stretches of the A93 North Deeside Road in Milltimber and Peterculter; the B979 Malcolm Road from the Aberdeenshire boundary for approximately one kilometre; Leuchar Den to Denmill and edge works from Crombie Circle northwards; Balgownie Road from the Parkway to Braehead Way and Bodachra Road to Scotstown Road; Riverview Drive from Todlaw Walk to the Asda roundabout; Great Southern Road from the Bridge of Dee approximately 400metres northwards; Springhill Road from Greenfern Road to Ythan Road [this is underway]; Wingate Road from Tillydrone Road to the car park; Kingswells Avenue from Kingswood Drive to Kingswells Crescent; The A974 Stoneywood Road from south of Greenburn Drive to Stoneywood Terrace; Broad Street from Upper Kirkgate to Queen Street.

A further £548,000 has yet to be allocated for resurfacing work and £75,000 for drainage operations.

Details of and dates for the schemes will be issued as they progress.

The council has hired contractors to help it carry out the essential works, which will help to improve the city's road network.

Enterprise, Planning and Infrastructure Director Gordon McIntosh said: "The floods in September and October, combined with the extremely harsh and prolonged winter wreaked havoc on the city's roads, leaving the council with a huge task to repair the roads.

"Roads staff have been working extremely hard to repair the roads since the thaw and are continuing to do so. The extra £2.5million allocated by the Enterprise, Planning and Infrastructure Committee from the Marischal College contingency fund will allow us to carry out a significant amount of extra essential repair work to roads, drainage systems, footpaths and street lighting.

"Unfortunately £2.5million is not enough to bring all of our roads up to scratch and considerable investment is still required here, as it is on the roads network across the UK."

(GK/KMcA)

Latest Construction News

20/10/2026
Scotland's leading public sector framework provider has opened bidding for a £900 million Refurbishment and Modernisation programme aimed at delivering urgent and planned works across housing and public buildings. The Scottish Procurement Alliance's Refurbishment and Modernisation framework (RM4S)
Read More
20/10/2026
A £1 million grant programme has been launched to help owners return vacant listed buildings across Glasgow to productive use. The Heritage Building Viability Grant Scheme, funded by Glasgow City Council and administered by Glasgow City Heritage Trust, is designed to bring floorspace in some of the
Read More
20/10/2026
Road resurfacing on the A702 at West Linton will take place over six nights from Monday 9 to Friday 13 November, and on Monday 16 November 2026, requiring overnight closures. Transport Scotland's operating company, BEAR Scotland, will deliver the scheme. For safety, the A702 will be closed each ni
Read More
20/10/2026
SP Energy Networks chief executive Nicola Connelly has welcomed the launch of a new industry plan setting out how the biggest grid upgrade in living memory will boost employment and economic growth across the UK. The Electricity Networks Sector Growth Plan – led by the Energy Networks Association (
Read More
20/10/2026
An £8 million scheme is under way to enhance accessibility for passengers at Dalwhinnie and improve performance on the Highland Main Line. The project will install a new crossover so trains can switch between tracks, enabling northbound services to use Platform 1 when step-free access is required.
Read More
20/10/2026
The Scottish Government intends to award Wills Bros Civil Engineering Ltd the contract to dual the A9 between Pitlochry and Killiecrankie, Economy, Tourism and Transport Secretary Stephen Flynn has announced. The move represents the final stage of procurement for the fifth A9 Dualling scheme to rea
Read More
20/10/2026
Residents in Clackmannanshire are already benefiting from a new electric nine-seater minibus provided by Robertson Construction Central East, part of the contractor's social value commitments linked to the Wellbeing Village and Lochies School development in Alloa. During construction, the vehicle i
Read More
20/10/2026
A major new study will examine how climate change could trigger cascading disruption across Scotland's critical infrastructure, giving organisations a clearer view of risks to the services people rely on daily. Commissioned by the Climate Ready Infrastructure Scotland Forum (CRIS) — a partnership o
Read More
20/10/2026
Clark Contracts has secured a place on Pagabo's Major Works Framework, enhancing its ability to support public sector bodies in delivering major construction and refurbishment schemes. The framework, expected to be worth up to £5bn over four years, follows the creation of a 10-year strategic delive
Read More
20/10/2026
North Ayrshire Council has carried out its annual winter dry run this month as it gets ready for the colder months. Roads staff took part in the exercise as part of preparations to keep roads, footways and communities safe and accessible during severe weather. It follows a meeting of Cabinet at wh
Read More
SEEIT3DKattrak International LtdVisual Precision LtdBlaven InteriorsClaymore Training LimitedRHP Renovations LtdWM DonnellyClyde Windows & Construction LTDLogical Insulation Solutions LimitedK A Tree Surgery