Repairs are progressing at several locations on Arran after Storm Boelo damaged roads across the island.
The storm washed away sections of the underlying road structure as well as damaging surfaces, making more extensive repairs necessary.
Among the worst-hit routes is the C147 near Catacol, which remains temporarily closed. Two local contractors have been appointed and are working at opposite ends of the closure to help speed up the work.
At the Catacol end, a new concrete wall is being built to enable the road to reopen and provide protection against future storms.
At the Lochranza end, rock armour and gabion baskets are needed to reinforce the road. A local contractor has secured a small amount of rock armour, with further deliveries expected. The main quantity will arrive by boat rather than on the passenger ferry to speed up the process.
Work is also under way on Newton Road in Lochranza, where Storm Boelo badly damaged the road in three places. A local contractor was appointed immediately and has built three concrete walls to allow the road to reopen and help protect it against future storms.
Scotland
UK
Ireland
London











