Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,045 companies....

Construction News

06/06/2022

Scottish Water Installs New Solar Scheme In Aberdeenshire

Scottish Water has installed an innovative solar scheme, which produces energy from both sides of a solar panel, at a site in Aberdeenshire to support the company's drive towards net zero emissions.

Over 1,800 solar photovoltaic (PV) panels, comprising a mix of double-sided 'bifacial' and standard modules, are now powering Fraserburgh's waste water treatment works in Aberdeenshire.

The carbon reducing technology will offset around 30 per cent of the electricity needed to operate the facility and generate over 0.76GWhr of energy each year – the same amount of energy needed to boil 1.8 million kettles.

The new installation is a result of a £985,000 investment by Scottish Water Horizons, the public utility's commercial subsidiary, making it the company's largest renewable energy project in the North East to date.

Roddy Speirs, Scottish Water Horizons Project Manager, said: "Despite the challenges of our geographic location, Scotland has a tremendous amount of solar power opportunity.

"Currently most solar PV arrays across the UK are single sided which means they can only generate energy from the front of the panel. Bifacial modules enable energy to be generated from both sides, significantly increasing energy generation potential.

-- Advertisement --
NorthernAsbestosServicesLtd

"We've installed sophisticated metering equipment to allow accurate measurements to be taken. If the panels perform in the way we hope, it will be an exciting step forward in the decarbonisation of Scottish Water's assets."

Bifacial panels work by generating electricity when sunlight strikes either side of the panel. Most of the electricity is generated when the light hits the top of the pane, however as both sides of the panel are capable of generating electricity, any light that bounces off the ground and hits the back of the panel generates electricity too.

The solar scheme at Fraserburgh will help cut the carbon footprint of the site by around 177 tonnes of CO2 each year - the equivalent of offsetting over 580,000 miles from the average passenger car.

Electric vehicle (EV) charging points have also been included as part of the green scheme to support the transition of Scottish Water's fleet of vans away from fossil fuels to clean energy.

Fraserburgh treatment works are managed by Grampian Water Services who worked closely with Horizons to deliver this project.

Grampian Water Services, General Manager, Simon Wrigglesworth, said: "It is fantastic to see such innovation at our Fraserburgh site. We are constantly looking at new ways to reduce our carbon footprint and increase green energy generation.

"This is the third project we've completed with Horizons this year to maximise use of our assets to reduce emissions and costs to both us and our customers.

"This is yet another exciting development in our journey towards Scottish Water's ambition to achieve net zero carbon emissions by 2040."

Renewable energy experts Absolute Solar and Wind delivered the onsite solar scheme earlier this year whilst adhering to ongoing Covid guidance.

Scottish Water has committed to reach net zero carbon emissions by 2040 with an interim target to host or self-generate three times its annual electricity consumption by 2030. Almost 80 of the company's water and waste water treatment works are now either self-sufficient or partly sufficient in their power requirements.

Latest Construction News

20/07/2026
SSEN Transmission has begun drilling at Rattray Head, near Peterhead, marking a key construction milestone for the Spittal to Peterhead High Voltage Direct Current (HVDC) scheme. Work that commenced this month involves Horizontal Directional Drilling (HDD) beneath the coastline to forge the critica
Read More
20/07/2026
Family-owned, Glasgow-based housebuilder AS Homes Scotland has submitted a planning application for 59 new affordable homes in Glasgow's East End, in partnership with Home Group, one of the UK's largest providers of high-quality housing and integrated health and social care support. Located on the
Read More
20/07/2026
The Construction Industry Training Board (CITB) and the Federation of Master Builders (FMB) have launched a new RMI (Retrofit) Sector Skills Plan, developed with input from the Sector Advisory Group on which NFRC sits. NFRC has welcomed the plan and its aims. Focusing on domestic retrofit and on he
Read More
20/07/2026
Three Robertson-delivered projects have been recognised by the Royal Institution of Chartered Surveyors (RICS) as exemplars of the built and natural environment across the UK at recent regional ceremonies. In Scotland, the comprehensive refurbishment of BlackRock's Edinburgh office secured the Comm
Read More
20/07/2026
Glasgow city centre will be handed over to families for a celebratory weekend as the refurbishment of George Square reaches its next milestone. The phased reopening is already under way, with the north carriageway returning to use on 26 June following works that began in May last year. Plans are b
Read More
20/07/2026
As Andy Burnham prepares to enter Downing Street, the Federation of Master Builders (FMB) has urged the incoming Prime Minister to prioritise rapid housing delivery and targeted support for small construction firms as the economy stagnates. Making the call, Brian Berry, Chief Executive of the FMB s
Read More
20/07/2026
Scottish Ministers have granted consents and marine licences for the North and South Caledonia offshore wind farms in the Moray Firth. Together, the schemes will cover around 429 km² and host up to 140 wind turbines. According to the projects, they could generate enough electricity annually to supp
Read More
20/07/2026
SSEN Transmission has revised plans for a temporary construction compound near Contin after listening to concerns raised by the local community during consultation and engagement. The facility, which will support delivery of the mainland underground cable section of the Western Isles HVDC Link, wil
Read More
17/07/2026
Construction has begun on a new £3.3 million paint facility at BAE Systems’ Govan shipyard in Glasgow as part of a wider programme to modernise the city's naval shipbuilding infrastructure. The new facility will allow ship blocks to be painted in a dedicated space, freeing up existing areas at the
Read More
17/07/2026
Retrofit and energy-efficiency specialist Procast Group has secured two awards at the Energy Efficiency Awards, with apprentice electrician Cameron Sleith also recognised as Apprentice of the Year. The company was named Regional Insulation & Fabric Installer and Contractor of the Year at the awards
Read More
SEEIT3DCarla MacKay InteriorsKFP Services LTDWindow StoreAberroof AberdeenArctic Spas RosebankBairds Windows LtdJRF Chimney Specialists and Heating DistributorsEuro-Fab (Scotland)James Smith Fencing Ltd