Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,933 companies....

Construction News

26/11/2008

Raychem HWAT Systems Specified For 16 Glasgow Schools

In a major schools investment programme, City Building (Glasgow) LLP is currently building 16 new primary schools in Glasgow for the City Council at a cost of over £128m and each is to have its hot water services supplied through a heat-traced single pipe system using Raychem HWAT self-regulating heating cables.

Smith Electrical, a Tyco Thermal Controls distributor partner, has been commissioned to supply and install the HWAT systems by the projects’ electrical controls contractor L-Tec Controls and Kentallen Group.

During extensive specification work with senior personnel within the City Council's Project Management and Design service it was recognised that a heat-traced single pipe system offers highly effective delivery of hot water services and significant installation and operating cost benefits.

-- Advertisement --
NorthernAsbestosServicesLtd

The Raychem HWAT hot water temperature maintenance system is a simple, intelligent and energy-efficient means of ensuring instant hot water is available at every hot tap, including those on 'dead legs'. By heat-tracing the pipework, water temperatures are maintained at a constant 55°C, without any need for secondary recirculation plumbing.

This temperature maintenance solution is not only significantly more energy-efficient than conventional re-circulation systems but, in eliminating return pipework, also offers space, material and installation time/cost savings too.

The heating cable has a flat construction that allows design and installation flexibility and is engineered for direct application onto hot water pipes. The intelligence of the system lies in the combination of the self-regulating heating cables and 'Smart' controls. Raychem HWAT-ECO is a smart control unit that limits the heat output of the self-regulating heating cables according to the specific requirements of the hot water system. It combines the clock time functions with monitoring of the boiler temperature in order to ensure that the system is used solely for temperature maintenance, thus avoiding superfluous heat production and minimising energy consumption.

Across the all the projects, Smith Electrical is installing over 10,600 metres of Raychem HWAT-R heating cable and 120 HWAT-ECO controllers.

(GK/KMcA)

Latest Construction News

20/10/2026
Scotland's leading public sector framework provider has opened bidding for a £900 million Refurbishment and Modernisation programme aimed at delivering urgent and planned works across housing and public buildings. The Scottish Procurement Alliance's Refurbishment and Modernisation framework (RM4S)
Read More
20/10/2026
A £1 million grant programme has been launched to help owners return vacant listed buildings across Glasgow to productive use. The Heritage Building Viability Grant Scheme, funded by Glasgow City Council and administered by Glasgow City Heritage Trust, is designed to bring floorspace in some of the
Read More
20/10/2026
Road resurfacing on the A702 at West Linton will take place over six nights from Monday 9 to Friday 13 November, and on Monday 16 November 2026, requiring overnight closures. Transport Scotland's operating company, BEAR Scotland, will deliver the scheme. For safety, the A702 will be closed each ni
Read More
20/10/2026
SP Energy Networks chief executive Nicola Connelly has welcomed the launch of a new industry plan setting out how the biggest grid upgrade in living memory will boost employment and economic growth across the UK. The Electricity Networks Sector Growth Plan – led by the Energy Networks Association (
Read More
20/10/2026
An £8 million scheme is under way to enhance accessibility for passengers at Dalwhinnie and improve performance on the Highland Main Line. The project will install a new crossover so trains can switch between tracks, enabling northbound services to use Platform 1 when step-free access is required.
Read More
20/10/2026
The Scottish Government intends to award Wills Bros Civil Engineering Ltd the contract to dual the A9 between Pitlochry and Killiecrankie, Economy, Tourism and Transport Secretary Stephen Flynn has announced. The move represents the final stage of procurement for the fifth A9 Dualling scheme to rea
Read More
20/10/2026
Residents in Clackmannanshire are already benefiting from a new electric nine-seater minibus provided by Robertson Construction Central East, part of the contractor's social value commitments linked to the Wellbeing Village and Lochies School development in Alloa. During construction, the vehicle i
Read More
20/10/2026
A major new study will examine how climate change could trigger cascading disruption across Scotland's critical infrastructure, giving organisations a clearer view of risks to the services people rely on daily. Commissioned by the Climate Ready Infrastructure Scotland Forum (CRIS) — a partnership o
Read More
20/10/2026
Clark Contracts has secured a place on Pagabo's Major Works Framework, enhancing its ability to support public sector bodies in delivering major construction and refurbishment schemes. The framework, expected to be worth up to £5bn over four years, follows the creation of a 10-year strategic delive
Read More
20/10/2026
North Ayrshire Council has carried out its annual winter dry run this month as it gets ready for the colder months. Roads staff took part in the exercise as part of preparations to keep roads, footways and communities safe and accessible during severe weather. It follows a meeting of Cabinet at wh
Read More
SEEIT3DCommercial Transmissions GroupCorsehouse Commercials LtdPentland Building & JoineryWestermans International LtdGMAC Utilities LtdGrampian Steel Buildings LtdAtlas Winch & Hoist Services LtdB Home DesignCF Concrete Pumping