Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,044 companies....

Construction News

06/06/2024

CCG Completes New Build Development At St Andrews Drive

CCG (Scotland) has announced the successful completion of a new build development at St Andrews Drive, the last of three phases of development works at Pollokshields on behalf of Southside Housing Association.

The 120 homes in the last phases were added to the 49 already completed in the summer of 2019.

The journey of this project began in March 2011, when the Association acquired 272 deck access flats from Glasgow Housing Association as part of the Pollokshields stock transfer agreement. These flats, spanning three distinct phases, had suffered chronic issues including dampness, poor insulation, and security problems for decades.

The new properties of Phases 2 and 3 were designed by jm architects and built by CCG using the firm's advanced offsite construction methods.

The project achieves the requirements of Housing for Varying Needs, The Glasgow Standard, Secured by Design (Gold Standard) and Glasgow City Council's 'Gold Hybrid' standard for sustainability.

-- Advertisement --
NorthernAsbestosServicesLtd

Alex Cameron, chairperson of Southside Housing Association, said:

"Our new homes are more than just buildings; they are a testament to sustainable living.

"The project emphasises minimising carbon usage and energy consumption, featuring high levels of insulation, triple glazing, heat recovery systems, on-site bicycle parking and charging points for electric vehicles.

"We are not only celebrating the completion of these new homes, but the creation of a community where people want to live. A community built from durable materials, designed to serve the local community for many years to come."

Mr Patrick Feeney, a new resident at the site, is delighted with his new flat. He added: "Our favourite feature is the balcony. It's great having our own private outdoor space, which we didn't have in a traditional tenement before.

"Our flat was so warm over winter, which makes a huge difference to our bills, and we are already establishing a really positive community spirit."

Alongside the construction of the new homes, CCG also supported a wide variety of community-based initiatives.

A £10,000 donation of fuel vouchers was distributed to SHA tenants and the wider community as well as £7,000 that contributed to the upgrade of a local community hub on Shields Road.

A further £3,000 was also donated to the Glendale Women's Café whilst £10,000 was donated to the Pollokshields Food Point in 2021.

Latest Construction News

17/07/2026
Construction has begun on a new £3.3 million paint facility at BAE Systems’ Govan shipyard in Glasgow as part of a wider programme to modernise the city's naval shipbuilding infrastructure. The new facility will allow ship blocks to be painted in a dedicated space, freeing up existing areas at the
Read More
17/07/2026
Retrofit and energy-efficiency specialist Procast Group has secured two awards at the Energy Efficiency Awards, with apprentice electrician Cameron Sleith also recognised as Apprentice of the Year. The company was named Regional Insulation & Fabric Installer and Contractor of the Year at the awards
Read More
17/07/2026
Residential management specialist Fresh has been appointed by Ropemaker to manage two purpose-built student accommodation (PBSA) developments in Edinburgh. Fresh took over management of Meadow Court and Norton's Student Living on 1 July 2026, expanding its existing partnership with Ropemaker, for w
Read More
17/07/2026
Essential resurfacing on the A721 Carnwath Road in Carluke will require a section of the route to be closed for up to four days this month. The works are scheduled to begin on Tuesday 21 July and will cover the stretch between Stanistone Road and Crawfordwalls Bridge. Traffic will be diverted via
Read More
17/07/2026
Aberdeenshire Council is inviting feedback on proposed changes to its Council Tax approach for long‑term empty properties and second homes, with new mitigations being considered alongside a premium due to take effect on 1 September. From 1 September this year, owners of homes left empty for m
Read More
17/07/2026
Grampian Housing Association has appointed David Fisher as its new group chief executive, succeeding Craig Stirrat who is due to retire later this year. Fisher will take up the role in August 2026 following a competitive recruitment process. The housing association said the Board’s recruitment pane
Read More
17/07/2026
Maryhill Housing Association (MHA) has lodged a planning bid for a 108-home neighbourhood on the long-vacant Collina Street plot in north Maryhill, with most properties proposed as affordable. The association has submitted its application to Glasgow City Council, seeking permission to redevelop the
Read More
17/07/2026
Kier has been appointed by the City of Edinburgh Council to deliver a £23m retrofit of residential accommodation in the Craigmillar and Peffermill districts of Edinburgh. Procured via the Scottish Procurement Alliance (SPA) framework, the scheme underpins the council’s environmental objectives. Kie
Read More
17/07/2026
BEAR Scotland, working on behalf of Transport Scotland, will carry out a series of resurfacing schemes at multiple locations on the A83 between Tarbert and Inveraray from Wednesday 29 July. Crews will operate between 7pm and 6am on working nights, with completion anticipated by Thursday 20 August.
Read More
17/07/2026
Investigations into pollution affecting the Kinghorn Burn in Fife are continuing, with public health advice to avoid contact with the water remaining in place. The Scottish Environment Protection Agency (SEPA) and Scottish Water are working alongside partners including Fife Council, NHS Fife and Fi
Read More
SEEIT3DBaseline Contracts LTDTHE HOME ARCHITECTWT ConsultancyDonnelly Safety ServicesCTW Safety LTDBusiness Solutions (SW) LTD123vNormac Oils LtdRox Electrical