Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,933 companies....

Construction News

05/10/2023

Work On Private Hospital In Granton Complete

A state-of-the-art independent private hospital specialising in cosmetic and plastic surgery has been completed at Granton on the outskirts of Edinburgh.

The Waterfront Hospital, owned and managed by consultant plastic surgeons Awf and Omar Quaba, has been designed by award-winning NVDC Architects which has a wealth of design experience across the health, surgical and dental sectors.

Following an initial search, NVDC founder Farahbod Nakhaei viewed several shortlisted properties in Edinburgh which were suitable for redevelopment, helping to appraise each for suitability, as well as potential limitations.

The chosen building in Granton had originally been part of a Morrisons supermarket development but had remained empty and unutilised for over 14 years. The building offered huge potential and its development will now contribute to the wider regeneration of the area.

Harnessing their previous experience in delivering private surgical facilities, the team at NVDC, led by Farahbod Nakhaei and Project Architect Anna Dach, produced the successful design as part of a competitive pitch process.

A key component of the client brief, in addition to being fully Scottish Health Technical Memorandum (SHTM) compliant, the design was to include one fully SHTM compliant general anaesthesia operating suite, a second operating theatre for local anaesthesia, treatment rooms and other ancillary spaces and a generous waiting area that could be used for educational purposes.

-- Advertisement --
NorthernAsbestosServicesLtd

Incorporating several complex design elements, including a bespoke staircase connecting the two main floors and following the curve of the external facade, the new private hospital is scheduled to be open to patients in early September.

Farahbod Nakhaei, founder at NVDC, said: "Having delivered several projects of a similar nature we understood the complexities of adhering to rigorous SHTM guidelines and building regulations. We were able to combine our understanding and passion to create a truly amazing and uplifting space which reflects the high standards of treatment and care provided by the client.

"Awf and Omar Quaba share our passion and ethos of creating spaces which promote and enhance both the physical and mental wellbeing."

The Waterfront Hospital features a cutting-edge building management system (BMS) with the ability to control and monitor the entire building environment to maintain the highest clinical standards.

As well as controlling and maintaining air changes, and required pressures, the BMS also controls the entire building’s mechanical and electrical services, such as access, ventilation, heating, lighting, medical gases and power.

Another key requirement of a complex building such as this is controlling access to various parts of the building. NVDC researched and specified the access control system ensuring the chosen system had the required functionality while in-keeping with the overall design of the building.

The NVDC team worked extensively with M&E consultants, Charles Scott & Partners, contractor Souness and Boyne, the access control manufacturers and client’s IT team to ensure the system could provide the complex array of requirements for managing the different levels of access to various parts of building. The access control system and the BMS can each be controlled via a mobile phone app.

The entire roof space has also been adapted to house necessary plant equipment. As part of their design, NVDC included a prefabricated modular rooftop plantroom which would house plant equipment in a weatherproof environment.

NVDC was instrumental in the design of an energy efficient lighting system operated by movement-controlled PIR sensors. As an integral part of the building design, NVDC worked closely with lighting engineers to develop a lighting design which promotes ease of flow throughout the building.

Latest Construction News

20/10/2026
Scotland's leading public sector framework provider has opened bidding for a £900 million Refurbishment and Modernisation programme aimed at delivering urgent and planned works across housing and public buildings. The Scottish Procurement Alliance's Refurbishment and Modernisation framework (RM4S)
Read More
20/10/2026
A £1 million grant programme has been launched to help owners return vacant listed buildings across Glasgow to productive use. The Heritage Building Viability Grant Scheme, funded by Glasgow City Council and administered by Glasgow City Heritage Trust, is designed to bring floorspace in some of the
Read More
20/10/2026
Road resurfacing on the A702 at West Linton will take place over six nights from Monday 9 to Friday 13 November, and on Monday 16 November 2026, requiring overnight closures. Transport Scotland's operating company, BEAR Scotland, will deliver the scheme. For safety, the A702 will be closed each ni
Read More
20/10/2026
SP Energy Networks chief executive Nicola Connelly has welcomed the launch of a new industry plan setting out how the biggest grid upgrade in living memory will boost employment and economic growth across the UK. The Electricity Networks Sector Growth Plan – led by the Energy Networks Association (
Read More
20/10/2026
An £8 million scheme is under way to enhance accessibility for passengers at Dalwhinnie and improve performance on the Highland Main Line. The project will install a new crossover so trains can switch between tracks, enabling northbound services to use Platform 1 when step-free access is required.
Read More
20/10/2026
The Scottish Government intends to award Wills Bros Civil Engineering Ltd the contract to dual the A9 between Pitlochry and Killiecrankie, Economy, Tourism and Transport Secretary Stephen Flynn has announced. The move represents the final stage of procurement for the fifth A9 Dualling scheme to rea
Read More
20/10/2026
Residents in Clackmannanshire are already benefiting from a new electric nine-seater minibus provided by Robertson Construction Central East, part of the contractor's social value commitments linked to the Wellbeing Village and Lochies School development in Alloa. During construction, the vehicle i
Read More
20/10/2026
A major new study will examine how climate change could trigger cascading disruption across Scotland's critical infrastructure, giving organisations a clearer view of risks to the services people rely on daily. Commissioned by the Climate Ready Infrastructure Scotland Forum (CRIS) — a partnership o
Read More
20/10/2026
Clark Contracts has secured a place on Pagabo's Major Works Framework, enhancing its ability to support public sector bodies in delivering major construction and refurbishment schemes. The framework, expected to be worth up to £5bn over four years, follows the creation of a 10-year strategic delive
Read More
20/10/2026
North Ayrshire Council has carried out its annual winter dry run this month as it gets ready for the colder months. Roads staff took part in the exercise as part of preparations to keep roads, footways and communities safe and accessible during severe weather. It follows a meeting of Cabinet at wh
Read More
SEEIT3DJames Smith Fencing LtdCelsius Plumbing and Heating (Edinburgh) LtdPrestige Concrete Sectional GaragesNorthern ContainersHorizon Reinforcing & Crane Hire Co LtdJ Building Contractors LtdLSMannCreagh Concrete Products LtdThe Sandstone Specialists