SSEN has welcomed a landmark in their drive to decarbonise heat in Scottish buildings with the installation of the first combined heat pump and home heat battery storage system in a home near Inverness.
The Re-HEAT project is testing the benefits of zero carbon heating for households and how Distribution Network Operators (DNOs) can manage the impact that heat pumps may have on grids.
Re-HEAT is a large-scale trial led by electricity DNOs, SP Energy Networks and Scottish and Southern Electricity Networks (SSEN), working in partnership with energy supply and solutions provider E.ON, heat pump manufacturers, Daikin and thermal storage unit manufacturers, Sunamp.
Installation of heat pumps with storage can help provide a comfortable temperature because they operate at a consistent rate throughout the day. The Re-HEAT project will test whether participating households can reduce their energy bills compared to LPG, oil or pure electric heating, for example by taking advantage of times when electricity prices are lower to charge their heat batteries. In the future, smart devices will allow households and businesses to benefit from flexing their energy use in response to a request, which will give them greater control over their energy bills whilst helping to balance supply and demand on the local electricity network.
The Scottish Government is committed to reaching net zero by 2045 and decarbonising heat in buildings is a priority. Heat pumps are already appearing across Scotland, with 22,000 already installed across SSEN's licence area in the north of Scotland, a figure that is expected to increase tenfold by the end of the decade.
To maximise the benefit of a heat pump system, the fabric of the property, such as its insulation, must be of a sufficient standard to allow a consistent temperature to be maintained. Insulation can also help keep energy bills lower for residents. Participants in the Re-HEAT project are assessed to ensure their properties are suitable for these technologies.
Catherine McDade, Re-HEAT Project participant: "I am finding my home lovely and warm. This is great because it wasn’t before the heat pump was installed. I love that I don’t have to touch the controls and the heating just comes on when the temperature drops. I have plenty of hot water. I would definitely recommend the heat pump."
Rhys Williams, Re-HEAT Project Manager for Scottish and Southern Electricity Networks said: "We are delighted to have reached the landmark of installing the first heat pump in a customer’s home and look forward to tracking the benefits to that household over the next couple of winters. Households with a heat pump and an electric vehicle can have a peak electricity requirement that is twenty times higher than households without these low carbon technologies. It is therefore essential that we manage the transition to net zero technologies as efficiently and cost effectively as possible."
Charlotte Flowerdew, Programme Manager at E.ON said: "We are delighted to be part of this ground-breaking project in Scotland. We have seen impressive uptake from households but there is still some time for eligible homeowners to take advantage of the funding available to upgrade their heating and hot water system to the latest technology. This will help lower carbon footprints and may help to reduce heating costs."
Scott Mathieson, Network Planning & Regulation Director at SP Energy Networks, said: "Our electricity networks are at the heart of the transition to a Net Zero Scotland, and we recognise the need to take action now to ensure they are able to cope with the significant increase in demand we know we’ll see as more low carbon technology is connected.
"We are really pleased to see our Re-HEAT project reach its first significant milestone, kickstarting our work to explore how electricity networks can facilitate the large-scale electrification of heat – which comes at a time when innovative solutions are more critical than ever to ensuring a Just Transition and to enabling us to keep power flowing to our customers and communities."
The Scottish Government, SSEN and SP Energy Networks are part of a Heat Electrification Strategic Partnership, focused on accelerating the decarbonisation of heating in Scotland.
Re-HEAT is a £5 million project, funded via a number of schemes including £1.26m from the Scottish Government's Low Carbon Infrastructure Transition Programme and £1.2m from Home Energy Efficiency Programme for Scotland.
Construction News
08/12/2022
SSEN Welcomes Landmark In Re-HEAT Decarbonisation Project


30/04/2025
Plans for a £43 million education campus on the Isle of Mull have moved forward, Argyll and Bute Council has confirmed.
Following a decision earlier this month on the preferred location, the council will now progress with developing a detailed brief and concept design to inform the overall busines

30/04/2025
Global engineering and development consultancy Mott MacDonald has been appointed by Strathclyde Partnership for Transport (SPT), in collaboration with Glasgow City Council on behalf of the Glasgow City Region, to progress two key elements of the Case for Investment for the ambitious Clyde Metro proj

30/04/2025
Members of the Caithness Committee have unanimously agreed to adopt the Caithness Area Place Plan (APP).
The committee also committed to fully supporting and promoting the plan, ensuring it is considered within other relevant plans, strategies, developments, and funding opportunities impacting the

30/04/2025
Plans for a new business park at Oban Airport have advanced significantly with the announcement that Argyll and Bute Council has appointed hub North Scotland to oversee the project and Robertson Construction as the main contractor.
The Oban Airport project is a key component of the council's Tax In

30/04/2025
Contractors engaged in public sector projects across the UK will soon be subject to random and targeted spot checks on their payment practices.
This move by the UK government is designed to tackle the persistent issue of late payments throughout the construction supply chain.
According to advice

30/04/2025
Ten new affordable flats for social rent have been completed by The Highland Council in Carrbridge, addressing a significant demand for smaller properties in the area.
The development, named Struan Court after the former Struan Hotel which previously occupied the site, offers eight one-bedroom and

30/04/2025
The City of Edinburgh Council has held collaborative summit with key partner organisations to explore avenues for expanding the availability of accessible housing across the capital.
The Accessible Housing Summit, hosted by the council, brought together representatives from the third sector, housin

30/04/2025
A significant step forward has been taken in the development of a new £16 million flood prevention scheme designed to safeguard Bridge of Allan. Stirling Council has approved the procurement of a contract to design and construct the essential flood defences.
The planned infrastructure will offer pr

30/04/2025
A significant 64% of companies within Scotland's renewable energy supply chain are actively investing in skills, capabilities, and facilities to capitalise on the nation's burgeoning clean energy market over the next three to five years, a survey by Scottish Renewables has revealed.
The findings we

30/04/2025
A collaborative effort between McTaggart Construction and West Dunbartonshire Council is set to bring new affordable housing and a range of community benefits to the Willox Park area. The partnership will deliver a 17-unit, client design led, affordable housing development, procured through Scotland