Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,933 companies....

Construction News

04/11/2022

Increase Capacity Identified At Ossian Wind Farm Development

SSE Renewables has identified an increase in the potential project capacity from 2.6GW to up to 3.6GW for the proposed Ossian Wind Farm off the East Coast of Scotland, which if achieved, would put it among the top five largest floating offshore wind farms globally.

The Ossian project is being delivered by a partnership of leading Scottish renewable energy developer, SSE Renewables, Japanese conglomerate Marubeni Corporation (Marubeni) and Danish fund management company Copenhagen Infrastructure Partners (CIP).

In recent months the Ossian project completed a full geophysical and benthic survey of the project area. The data collected has informed a review of the potential wind farm capacity. Subject to undertaking the necessary further environmental and technical assessments, the site could be used to generate the increased capacity of up to 3.6GW.

David Willson, Senior Project Manager For Ossian, said: "We are excited that through further technical assessment of our project area, we now believe Ossian could provide an even greater renewable electricity output. If realised, this change would position the project among the top five largest floating projects in the world, demonstrating its epic scale. This is a great motivator for project partners SSE Renewables, Marubeni and CIP and the whole project team."

-- Advertisement --
NorthernAsbestosServicesLtd

David continued: "Our geophysical survey collected data to a very high standard, ahead of schedule and under budget in 109 days with zero HSE incidents – an amazing achievement to be proud of.

"Our FLiDAR and Metocean measurement campaign successfully kicked-off in August which will deliver comprehensive measurements of the metocean conditions to inform the development of the Ossian site.

"We will now work with our stakeholders and regulators to secure the appropriate consent so that the full potential of the Ossian Wind Farm Project can be realised."

Floating LiDAR (or FLiDAR: Floating Light Detection and Ranging) equipment is now acquiring data at the Ossian site having been deployed by Glasgow-based metocean specialists PARTRAC.

The company has placed EOLOS FLS 200 FLiDAR equipment across two locations at the Ossian site with the aim of measuring wind speed and direction to help determine the best locations and positions for wind turbines.

PARTRAC have also deployed their metocean equipment consisting of three wave buoys and three subsea moorings at three locations. The installed equipment will measure the waves, current, tidal levels, turbidity, conductivity, and temperature.

Sam Athey Managing Director From PARTRAC, said: "Our work at the Ossian site marks the start of two years of data collection so that we can build knowledge of site characteristics and capture critical metocean data. This is an incredibly important process as it establishes both the wind resource and environmental conditions for the project. We're very pleased and proud to be involved in this flagship project."

The proposed floating offshore wind farm takes its name Ossian (pronounced 'os-si-un') from The Poems of Ossian. It is set to be located across 858 km2 of seabed in waters off the east coast of Scotland. The deployment of floating offshore wind turbines delivering up to 3.6GW of new installed capacity is enough to be capable of powering almost 6 million Scottish homes and offsetting around 7.5 million tonnes of harmful carbon emissions each year.

When complete, the project will be amongst the world's largest floating offshore wind farms, positioning Scotland as a global leader in floating offshore wind technology. The Ossian team will be holding scoping workshops with key stakeholders on week commencing November 14th to help better understand their initial views.

Latest Construction News

20/10/2026
Scotland's leading public sector framework provider has opened bidding for a £900 million Refurbishment and Modernisation programme aimed at delivering urgent and planned works across housing and public buildings. The Scottish Procurement Alliance's Refurbishment and Modernisation framework (RM4S)
Read More
20/10/2026
A £1 million grant programme has been launched to help owners return vacant listed buildings across Glasgow to productive use. The Heritage Building Viability Grant Scheme, funded by Glasgow City Council and administered by Glasgow City Heritage Trust, is designed to bring floorspace in some of the
Read More
20/10/2026
Road resurfacing on the A702 at West Linton will take place over six nights from Monday 9 to Friday 13 November, and on Monday 16 November 2026, requiring overnight closures. Transport Scotland's operating company, BEAR Scotland, will deliver the scheme. For safety, the A702 will be closed each ni
Read More
20/10/2026
SP Energy Networks chief executive Nicola Connelly has welcomed the launch of a new industry plan setting out how the biggest grid upgrade in living memory will boost employment and economic growth across the UK. The Electricity Networks Sector Growth Plan – led by the Energy Networks Association (
Read More
20/10/2026
An £8 million scheme is under way to enhance accessibility for passengers at Dalwhinnie and improve performance on the Highland Main Line. The project will install a new crossover so trains can switch between tracks, enabling northbound services to use Platform 1 when step-free access is required.
Read More
20/10/2026
The Scottish Government intends to award Wills Bros Civil Engineering Ltd the contract to dual the A9 between Pitlochry and Killiecrankie, Economy, Tourism and Transport Secretary Stephen Flynn has announced. The move represents the final stage of procurement for the fifth A9 Dualling scheme to rea
Read More
20/10/2026
Residents in Clackmannanshire are already benefiting from a new electric nine-seater minibus provided by Robertson Construction Central East, part of the contractor's social value commitments linked to the Wellbeing Village and Lochies School development in Alloa. During construction, the vehicle i
Read More
20/10/2026
A major new study will examine how climate change could trigger cascading disruption across Scotland's critical infrastructure, giving organisations a clearer view of risks to the services people rely on daily. Commissioned by the Climate Ready Infrastructure Scotland Forum (CRIS) — a partnership o
Read More
20/10/2026
Clark Contracts has secured a place on Pagabo's Major Works Framework, enhancing its ability to support public sector bodies in delivering major construction and refurbishment schemes. The framework, expected to be worth up to £5bn over four years, follows the creation of a 10-year strategic delive
Read More
20/10/2026
North Ayrshire Council has carried out its annual winter dry run this month as it gets ready for the colder months. Roads staff took part in the exercise as part of preparations to keep roads, footways and communities safe and accessible during severe weather. It follows a meeting of Cabinet at wh
Read More
SEEIT3DContainexSEEIT3DHutton Stone Co LtdPinecrest Floors LTDACCON UK LtdContainer Hire Services LtdA.G.S Steel Erectors LtdExcavator Parts DirectBilanco Blinds Ltd