Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,933 companies....

Construction News

01/11/2022

Redevelopment Proposal For Former Glasgow Nightclub

Real estate investor CA Ventures has proposed a major redevelopment of the former Archaos nightclub site, located in Queen Street, Glasgow.

The intention is to deliver a high-quality, purpose-built, managed student accommodation, providing active ground floor uses, which may include retail or commercial uses.

The proposed development could generate around 250 construction jobs, including direct on-site jobs and jobs in the construction supply chain. This could be worth more than £10m to the Glasgow economy during the construction phase.

Serving to address a recognised shortage of student accommodation in the city, the public will have the chance to view proposals and provide feedback at two forthcoming consultation events.

The Archaos nightclub, which closed its doors in 2007 and has lain vacant since. It is in extremely poor condition and does not offer sufficient floor area or a suitable internal layout to provide a viable development opportunity for commercial or residential use.

Previous proposals to open the building as a nightclub and later as an office scheme floundered on the considerable costs required to refurbish a building that had deteriorated considerably over the years.

-- Advertisement --
NorthernAsbestosServicesLtd

As one of the few viable options, student accommodation will aim to accommodate circa 230 students with fully serviced apartments and state-of-the-art amenity facilities.

Redevelopment of the site will act as a catalyst for regeneration in this part of the City Centre. The site is within walking distance of Strathclyde University, Caledonian University, and the City of Glasgow College.

As part of the pre-application consultation process, two statutory consultations will be held for the project, the first on Wednesday 2nd November (4-8 pm) and the second will be held on Thursday 1st December (2-6 pm) at the former Bowery Bar, 35-41 Queen Street, Glasgow, G1 3EF. 

Proposals will see a planning application submitted hopefully towards the end of the year. If planning permissions is approved, the intention is for work to start on-site in 2023. The targeted entry date will serve the beginning of the academic year in August 2025.

CA Ventures have a proven track record in delivering sustainable buildings. An array of renewable and energy-saving technologies will be installed to minimise the carbon footprint created both during construction and when occupied. 

A representative from CA Ventures said: "These exciting proposals represent a significant investment in Glasgow and will serve to regenerate a currently derelict site.

"They will serve to provide much-needed student accommodation in a building which has lain empty since 2007 and which, due to its condition, provide limited options for redevelopment. 

"During a well-documented shortage of purpose-built student accommodation, potential students have no choice but to explore rental accommodation, which adds to the already significant strain on housing stock.

"We envisage this site as a perfect opportunity to add to the vibrant community of students currently living in central Glasgow, benefitting local shops.

"These proposals are at an early design stage, and over the next few weeks, we look forward to engaging in discussions with the local community about how best to progress this."

Latest Construction News

20/10/2026
Scotland's leading public sector framework provider has opened bidding for a £900 million Refurbishment and Modernisation programme aimed at delivering urgent and planned works across housing and public buildings. The Scottish Procurement Alliance's Refurbishment and Modernisation framework (RM4S)
Read More
20/10/2026
A £1 million grant programme has been launched to help owners return vacant listed buildings across Glasgow to productive use. The Heritage Building Viability Grant Scheme, funded by Glasgow City Council and administered by Glasgow City Heritage Trust, is designed to bring floorspace in some of the
Read More
20/10/2026
Road resurfacing on the A702 at West Linton will take place over six nights from Monday 9 to Friday 13 November, and on Monday 16 November 2026, requiring overnight closures. Transport Scotland's operating company, BEAR Scotland, will deliver the scheme. For safety, the A702 will be closed each ni
Read More
20/10/2026
SP Energy Networks chief executive Nicola Connelly has welcomed the launch of a new industry plan setting out how the biggest grid upgrade in living memory will boost employment and economic growth across the UK. The Electricity Networks Sector Growth Plan – led by the Energy Networks Association (
Read More
20/10/2026
An £8 million scheme is under way to enhance accessibility for passengers at Dalwhinnie and improve performance on the Highland Main Line. The project will install a new crossover so trains can switch between tracks, enabling northbound services to use Platform 1 when step-free access is required.
Read More
20/10/2026
The Scottish Government intends to award Wills Bros Civil Engineering Ltd the contract to dual the A9 between Pitlochry and Killiecrankie, Economy, Tourism and Transport Secretary Stephen Flynn has announced. The move represents the final stage of procurement for the fifth A9 Dualling scheme to rea
Read More
20/10/2026
Residents in Clackmannanshire are already benefiting from a new electric nine-seater minibus provided by Robertson Construction Central East, part of the contractor's social value commitments linked to the Wellbeing Village and Lochies School development in Alloa. During construction, the vehicle i
Read More
20/10/2026
A major new study will examine how climate change could trigger cascading disruption across Scotland's critical infrastructure, giving organisations a clearer view of risks to the services people rely on daily. Commissioned by the Climate Ready Infrastructure Scotland Forum (CRIS) — a partnership o
Read More
20/10/2026
Clark Contracts has secured a place on Pagabo's Major Works Framework, enhancing its ability to support public sector bodies in delivering major construction and refurbishment schemes. The framework, expected to be worth up to £5bn over four years, follows the creation of a 10-year strategic delive
Read More
20/10/2026
North Ayrshire Council has carried out its annual winter dry run this month as it gets ready for the colder months. Roads staff took part in the exercise as part of preparations to keep roads, footways and communities safe and accessible during severe weather. It follows a meeting of Cabinet at wh
Read More
SEEIT3DB Home DesignCF Concrete PumpingDublcheck Cleaning GlasgowCRGP LimitedKrew-basePro Vent ComplianceKelly TanksDiscount Kitchens and Bathrooms LtdDunedin Stone Ltd