Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,933 companies....

Construction News

28/10/2022

Ocergy Awarded Salamander Pre-FEED Foundation Design

The Salamander floating offshore wind project – a joint venture between Simply Blue Group, Ørsted and Subsea7 – has awarded the pre-FEED foundation design to Ocergy for its OCG-Wind foundation technology.

Last year, Salamander signed a memorandum of understanding (MoU) with Ocergy to evaluate its foundation design for the development in North-east Scotland. The project will be a contributor to ensuring the UK government's target of delivering 5GW of operational floating offshore wind by 2030.

Ocergy has developed OCG-Wind, a novel and efficient floating wind turbine foundation, to support very large wind turbines (>10MW), designed for the development of large-scale wind farms. It is targeting a levelised cost of energy (LCOE) that can start to drive reductions in floating offshore wind farms to eventually be competitive with fixed offshore wind farms.

OCG-Wind is a semi-submersible platform designed to utilise the industrial performance of the hull fabrication and assembly through the maximisation of the local supply chain. The hull is made of three outside circular columns connected mechanically with trusses to a central column that supports the wind turbine.

A feasibility study considered all aspects of the design, technical performance, fabrication, assembly, operations and installation of the OCG-Wind for Salamander. It also reviewed the compatibility of the OCG-Wind platform to the site, inclusive of performance, and supply chain and local content management, as well as identified schedule risks and overall project costs. This feasibility study will now progress to pre-FEED phase.

-- Advertisement --
NorthernAsbestosServicesLtd

Huw Bell, Salamander Project Director said: "From inception, the foundation manufacturing and assembly was a crucial element for us in delivering higher local content. We're focusing on the capabilities of the Scottish supply chain, which is helping us in deciding which technologies to advance. Ocergy's OCG-Wind technology meets our requirements.

"We aim to provide access to double the number of Scottish port facilities over some traditional floating concepts due to lower draft requirements. We also expect a scalable fabrication and assembly process, suitable for commercial scale deployment as well as decreasing fabricated steel mass by around a third, which will reduce the cost of energy whilst also providing potential for local fabrication."

Dominique Roddier, Ocergy's CEO said: "The Salamander project is of paramount importance for our consortium and the floating offshore wind industry. This project will demonstrate that the premise of delivering one unit per week, week after week is achievable. This is the last major industry hurdle before the deployment of large, commercial-scale, floating wind projects."

Salamander, located 35km off Peterhead, is designed to provide the Scottish supply chain with an early capacity development opportunity, enabling it to play a much greater role in subsequent large-scale floating offshore wind buildout. The project will deploy innovative and cutting-edge floating offshore wind technologies to support the cost reduction and learning journey needed for the commercial deployment of floating offshore wind.

Salamander is intended to be progressed through the innovation track of Crown Estate Scotland's Innovation and Targeted Oil and Gas (INTOG) leasing round. The INTOG round will grant seabed leases through an auction process, which will be split into two pots – one for smaller scale innovation projects of less than 100 MW and one for larger projects linked to oil and gas infrastructure.

Latest Construction News

20/10/2026
Scotland's leading public sector framework provider has opened bidding for a £900 million Refurbishment and Modernisation programme aimed at delivering urgent and planned works across housing and public buildings. The Scottish Procurement Alliance's Refurbishment and Modernisation framework (RM4S)
Read More
20/10/2026
A £1 million grant programme has been launched to help owners return vacant listed buildings across Glasgow to productive use. The Heritage Building Viability Grant Scheme, funded by Glasgow City Council and administered by Glasgow City Heritage Trust, is designed to bring floorspace in some of the
Read More
20/10/2026
Road resurfacing on the A702 at West Linton will take place over six nights from Monday 9 to Friday 13 November, and on Monday 16 November 2026, requiring overnight closures. Transport Scotland's operating company, BEAR Scotland, will deliver the scheme. For safety, the A702 will be closed each ni
Read More
20/10/2026
SP Energy Networks chief executive Nicola Connelly has welcomed the launch of a new industry plan setting out how the biggest grid upgrade in living memory will boost employment and economic growth across the UK. The Electricity Networks Sector Growth Plan – led by the Energy Networks Association (
Read More
20/10/2026
An £8 million scheme is under way to enhance accessibility for passengers at Dalwhinnie and improve performance on the Highland Main Line. The project will install a new crossover so trains can switch between tracks, enabling northbound services to use Platform 1 when step-free access is required.
Read More
20/10/2026
The Scottish Government intends to award Wills Bros Civil Engineering Ltd the contract to dual the A9 between Pitlochry and Killiecrankie, Economy, Tourism and Transport Secretary Stephen Flynn has announced. The move represents the final stage of procurement for the fifth A9 Dualling scheme to rea
Read More
20/10/2026
Residents in Clackmannanshire are already benefiting from a new electric nine-seater minibus provided by Robertson Construction Central East, part of the contractor's social value commitments linked to the Wellbeing Village and Lochies School development in Alloa. During construction, the vehicle i
Read More
20/10/2026
A major new study will examine how climate change could trigger cascading disruption across Scotland's critical infrastructure, giving organisations a clearer view of risks to the services people rely on daily. Commissioned by the Climate Ready Infrastructure Scotland Forum (CRIS) — a partnership o
Read More
20/10/2026
Clark Contracts has secured a place on Pagabo's Major Works Framework, enhancing its ability to support public sector bodies in delivering major construction and refurbishment schemes. The framework, expected to be worth up to £5bn over four years, follows the creation of a 10-year strategic delive
Read More
20/10/2026
North Ayrshire Council has carried out its annual winter dry run this month as it gets ready for the colder months. Roads staff took part in the exercise as part of preparations to keep roads, footways and communities safe and accessible during severe weather. It follows a meeting of Cabinet at wh
Read More
SEEIT3DPAUL Heat RecoveryAdvanced Window FilmsCommercial Transmissions GroupCorsehouse Commercials LtdPentland Building & JoineryWestermans International LtdGMAC Utilities LtdGrampian Steel Buildings LtdAtlas Winch & Hoist Services Ltd