Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,045 companies....

Construction News

13/11/2020

Millport Flood Protection Scheme Moves To Final Design

A £27.5million flood protection scheme for Millport has been approved to move to 'final confirmation' stage by North Ayrshire Council's Cabinet.

The approval will allow the proposal to progress on the final design and preparation of tender documents for the construction stage.

The flood protection scheme aims to create an offshore breakwater connecting the small islands in Millport Bay, in addition to onshore flood walls and other protection along the Millport shoreline, reducing the risk of flooding to vulnerable properties in the town.

It will include the creation of a 120m long rock armour breakwater connecting The Leug and The Spoig islands and a 210m long rock armour breakwater between The Spoig and the southern Eilean. The blueprint also includes onshore flood walls and drainage improvements to minimise residual flood risks.

-- Advertisement --
NorthernAsbestosServicesLtd

Not only is the scheme aimed at protecting properties from flooding, but a major element of the design aims to enhance access along the Millport seafront for both pedestrians and cyclists, as well as making a positive contribution to public realm.

Councillor Jim Montgomerie, Cabinet Member for Green New Deal & Sustainability, said: "This is another important milestone for the Millport Flood Protection Scheme and I'm delighted we have reached this stage.

"The community has been fully involved throughout the process and their input has been invaluable."

Extensive community engagement has allowed local residents to help shape the proposals which have gathered strong community support.

The estimated cost of the scheme is £27.5m, with 80 per cent of the funding coming from the Scottish Government and the remaining 20 per cent funded by North Ayrshire Council.

Construction is currently expected to get under way in 2022 and is likely to take approximately two years to complete.

Latest Construction News

20/07/2026
SSEN Transmission has begun drilling at Rattray Head, near Peterhead, marking a key construction milestone for the Spittal to Peterhead High Voltage Direct Current (HVDC) scheme. Work that commenced this month involves Horizontal Directional Drilling (HDD) beneath the coastline to forge the critica
Read More
20/07/2026
Family-owned, Glasgow-based housebuilder AS Homes Scotland has submitted a planning application for 59 new affordable homes in Glasgow's East End, in partnership with Home Group, one of the UK's largest providers of high-quality housing and integrated health and social care support. Located on the
Read More
20/07/2026
The Construction Industry Training Board (CITB) and the Federation of Master Builders (FMB) have launched a new RMI (Retrofit) Sector Skills Plan, developed with input from the Sector Advisory Group on which NFRC sits. NFRC has welcomed the plan and its aims. Focusing on domestic retrofit and on he
Read More
20/07/2026
Three Robertson-delivered projects have been recognised by the Royal Institution of Chartered Surveyors (RICS) as exemplars of the built and natural environment across the UK at recent regional ceremonies. In Scotland, the comprehensive refurbishment of BlackRock's Edinburgh office secured the Comm
Read More
20/07/2026
Glasgow city centre will be handed over to families for a celebratory weekend as the refurbishment of George Square reaches its next milestone. The phased reopening is already under way, with the north carriageway returning to use on 26 June following works that began in May last year. Plans are b
Read More
20/07/2026
As Andy Burnham prepares to enter Downing Street, the Federation of Master Builders (FMB) has urged the incoming Prime Minister to prioritise rapid housing delivery and targeted support for small construction firms as the economy stagnates. Making the call, Brian Berry, Chief Executive of the FMB s
Read More
20/07/2026
Scottish Ministers have granted consents and marine licences for the North and South Caledonia offshore wind farms in the Moray Firth. Together, the schemes will cover around 429 km² and host up to 140 wind turbines. According to the projects, they could generate enough electricity annually to supp
Read More
20/07/2026
SSEN Transmission has revised plans for a temporary construction compound near Contin after listening to concerns raised by the local community during consultation and engagement. The facility, which will support delivery of the mainland underground cable section of the Western Isles HVDC Link, wil
Read More
17/07/2026
Construction has begun on a new £3.3 million paint facility at BAE Systems’ Govan shipyard in Glasgow as part of a wider programme to modernise the city's naval shipbuilding infrastructure. The new facility will allow ship blocks to be painted in a dedicated space, freeing up existing areas at the
Read More
17/07/2026
Retrofit and energy-efficiency specialist Procast Group has secured two awards at the Energy Efficiency Awards, with apprentice electrician Cameron Sleith also recognised as Apprentice of the Year. The company was named Regional Insulation & Fabric Installer and Contractor of the Year at the awards
Read More
SEEIT3DThe Water PointKattrak International LtdG M Joinery Scotland LtdLogical Insulation Solutions LimitedK A Tree SurgeryClaymore Training LimitedCross BlindsK&C LandscapesThomas Haywood Aerial Photography