Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,045 companies....

Construction News

31/01/2019

Contractor Appointed To Build Anaerobic Plant

A contractor has been appointed to build an anaerobic digestion gas to grid plant, which will take Aberdeen's food waste, agricultural crops, and waste products to produce biogas to power the multi-million-pound new TECA arena, conference centre and exhibition building.

Austrian-based specialist company Thöni Industriebetriebe GmbH is to construct the Anaerobic Digestion Gas to Grid (AD G2G) plant which will produce green gas and inject it into the national grid.

The plant will take the city's food waste alongside crop fuels and waste products from agriculture, to produce biogas which will be upgraded to biomethane and injected into the natural gas grid and piped to the onsite Energy Centre at TECA.

TECA arena, conference centre and exhibition building is part of the new AECC project which includes two on-site hotels, an energy centre, extensive landscaping and parking. The entire site is being built by Aberdeen City Council along with development partner Henry Boot Developments (HBD), and main contractor Robertson Group.

Aberdeen City Council Co-Leader Councillor Jenny Laing said: "The AD plant project powering the TECA complex underpins the position of Aberdeen as a world-class city for energy and innovation and the centre as the place to see how energy, environment and business can be integrated on a truly significant scale.

"We are in the midst of the most important period of transformation Aberdeen has ever experienced including an increased focus on renewable energy sources as part of our Regional Economic Strategy, and it's fantastic that TECA can lead on that.

-- Advertisement --
NorthernAsbestosServicesLtd

"The quality and scale of TECA is designed to attract global events and acts, supporting our ambitions to grow the number of visitors we attract from local, regional, national and international markets, and we're delighted that the renewable energy from the AD plant will be part of that."

TECA will provide a new world-class facility for Scotland beside Aberdeen International Airport, and the new city bypass. The 12,500-capacity main arena will host conferences, exhibitions and music concerts, and is expected to attract major artists and events to the city. The facility will also boast three further conference/exhibition halls, four multi-purpose conference suites, and nine meeting rooms.

The interiors of the facility are being fitted out with progress on internal blockwork, metal stud partitions, and mechanical, electrical and plumbing installations continuing, and rooms taking shape include the main area, exhibition halls, and conference rooms.

The facility is expected to contribute an additional 4.5 million visitors, £113million of visitor spend and £63million net Gross Value Added to the Scottish economy, over 10 years. It will also result in the creation of 352 full-time-equivalent permanent positions by year 10 of operations.

The AD G2G plant is an integral part of TECA and in connection with the onsite energy centre is one of the key income streams for the development., and will receive a subsidy from UK Government which is guaranteed for 20 years, in the form of the Renewable Heat Incentive.

The plant will process 81,000 tonnes feedstock per annum, and 41,300 tonnes of this will be waste materials (OFGEM require at least 50% waste or residuals), and the rest will be crop-based.

The plant will enable the TECA building to achieve a BREEAM Excellent standard and to meet the sustainability criteria of the building standards, and has been designed with the capability if it needs to connect to the mains gas grid. The plant is designed to produce 425m3/h of gas for injection into the grid with 200m3/h for 8,000 hours per year to go to the energy centre.

Thoeni is a family-owned company founded in 1964 and with headquarters located in Tyrol in Austria, and has been building renewable energy facilities for more than 25 years. The company has been working closely with Target Renewables Ltd based in Ayr, Scotland, since 2013 and has successfully built several digestion facilities in the UK.

Robert Lackner of Thoeni said: "We're really excited both about the project itself but also in being part of the story. Even more so, as this is part of show case for "the future of energy supply" in the middle of the centre of the fossil gas and oil industry."

Robin Szmidt of Target Renewables also said: "I'm looking forward to the project becoming not just an engineering success but also a success for the new AECC, the city, and the local community."

Latest Construction News

20/07/2026
SSEN Transmission has begun drilling at Rattray Head, near Peterhead, marking a key construction milestone for the Spittal to Peterhead High Voltage Direct Current (HVDC) scheme. Work that commenced this month involves Horizontal Directional Drilling (HDD) beneath the coastline to forge the critica
Read More
20/07/2026
Family-owned, Glasgow-based housebuilder AS Homes Scotland has submitted a planning application for 59 new affordable homes in Glasgow's East End, in partnership with Home Group, one of the UK's largest providers of high-quality housing and integrated health and social care support. Located on the
Read More
20/07/2026
The Construction Industry Training Board (CITB) and the Federation of Master Builders (FMB) have launched a new RMI (Retrofit) Sector Skills Plan, developed with input from the Sector Advisory Group on which NFRC sits. NFRC has welcomed the plan and its aims. Focusing on domestic retrofit and on he
Read More
20/07/2026
Three Robertson-delivered projects have been recognised by the Royal Institution of Chartered Surveyors (RICS) as exemplars of the built and natural environment across the UK at recent regional ceremonies. In Scotland, the comprehensive refurbishment of BlackRock's Edinburgh office secured the Comm
Read More
20/07/2026
Glasgow city centre will be handed over to families for a celebratory weekend as the refurbishment of George Square reaches its next milestone. The phased reopening is already under way, with the north carriageway returning to use on 26 June following works that began in May last year. Plans are b
Read More
20/07/2026
As Andy Burnham prepares to enter Downing Street, the Federation of Master Builders (FMB) has urged the incoming Prime Minister to prioritise rapid housing delivery and targeted support for small construction firms as the economy stagnates. Making the call, Brian Berry, Chief Executive of the FMB s
Read More
20/07/2026
Scottish Ministers have granted consents and marine licences for the North and South Caledonia offshore wind farms in the Moray Firth. Together, the schemes will cover around 429 km² and host up to 140 wind turbines. According to the projects, they could generate enough electricity annually to supp
Read More
20/07/2026
SSEN Transmission has revised plans for a temporary construction compound near Contin after listening to concerns raised by the local community during consultation and engagement. The facility, which will support delivery of the mainland underground cable section of the Western Isles HVDC Link, wil
Read More
17/07/2026
Construction has begun on a new £3.3 million paint facility at BAE Systems’ Govan shipyard in Glasgow as part of a wider programme to modernise the city's naval shipbuilding infrastructure. The new facility will allow ship blocks to be painted in a dedicated space, freeing up existing areas at the
Read More
17/07/2026
Retrofit and energy-efficiency specialist Procast Group has secured two awards at the Energy Efficiency Awards, with apprentice electrician Cameron Sleith also recognised as Apprentice of the Year. The company was named Regional Insulation & Fabric Installer and Contractor of the Year at the awards
Read More
SEEIT3D123vNormac Oils LtdRox ElectricalCaledonia Crane Hire LtdSpray Solutions Scotland LTDPAUL Heat RecoveryCorsehouse Commercials LtdPentland Building & JoineryGlasgow Handyman Solutions