Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,920 companies....

Construction News

14/09/2017

Council To Start Search For Stonehaven Flood Protection Scheme Contractor

Aberdeenshire Council is to start hunting for a contractor to deliver the £16 million Stonehaven Flood Protection Scheme.

Following the project's legal confirmation, engineers can proceed to tender for the scheme which aims to reduce flood risk to 372 residential properties, two public utility sites, a school and an emergency service site.

Overall, the development comprises of a series of individual projects;

• Alteration to five bridges along the River Carron; removing, replacing and raising the Red Bridge and Green Bridge; repositioning the Green Bridge; removing, refurbishing and reinstating the White Bridge in a raised position; replacing the Bridgefield Bridge parapet with a reinforced glass type material; and raising and widening the Beach Bridge

-- Advertisement --
NorthernAsbestosServicesLtd

• Construction of flood walls between the Red Bridge and the river mouth

• The island downstream of the Green Bridge will be removed

• Installation of two higher capacity culverts on the Glaslaw Burn

It is designed to provide a 0.5% chance of occurrence (1 in 200-year flood event) standard of protection, including an allowance for climate change (33% increase to 2080) and a safety margin catering for uncertainties.

Following a consultation 12 objections had been received to the scheme – four were resolved through negotiation but the others remained outstanding. Following publication of a formal notice, outstanding objectors had six weeks to apply for a judicial review of the scheme’s confirmation, but none took this opportunity.

With the scheme becoming operative on 04 September, the council now has the power to enter properties and to build on land it does not own to complete the development.

Pre-construction preparation is expected to take place around the town from October, with the tender for construction to be issued at the end of the year. Main works are then scheduled to start around August 2018, with the project taking around two years to compete.

(LM/MH)

Latest Construction News

09/09/2026
Homes on Braeside Place, Reddingmuirhead, will face a lower risk of flooding after improvement works were completed in August. The £30,000 scheme followed an in-depth flood study that identified a straightforward, effective fix for a long-standing issue affecting a small number of properties. Duri
Read More
09/09/2026
Trials exploring the use of heavy-lift drones across forestry tasks and wildlife management have identified further promising, potentially game-changing applications for unmanned aircraft. The work, delivered with DroneWild — which is licensed and insured to operate the aircraft — is FLS's fourth c
Read More
09/09/2026
Construction is commencing on the Kingswood site in Dunfermline, paving the way for a new city quarter that will bring thousands of homes, extensive green space and key community facilities over the coming decades. Part of the Dunfermline North, West and South West Strategic Land Allocation, Kingsw
Read More
09/09/2026
Housebuilder Cruden has finalised a contract with the landowner to buy the former Postings Shopping Centre site in Kirkcaldy, marking a major step towards delivering new affordable housing in the heart of the town. Working alongside Kingdom Group, the company is progressing plans to bring the high-
Read More
09/09/2026
BEAR Scotland, working on behalf of Transport Scotland, will begin overnight resurfacing on the A87 between Invergarry and Bun Loyne from Sunday 4 October. Crews will operate between 8pm and 6am each night, with no works taking place on Saturday or Sunday nights. Subject to favourable weather, the
Read More
09/09/2026
More than 2.55 million crossings have been recorded in the two years since the Govan - Partick Bridge opened, with cyclists' journeys up 5.5% in its second year. The pedestrian and cycle bridge has quickly become a staple of Glasgow's active travel network. Of the total crossings to date, around th
Read More
09/09/2026
Temporary traffic lights and a 30mph limit will operate from 21 September for 26 weeks as SP Energy Networks connects a new battery energy storage site (BESS) to the electricity grid near Longannet. To enable the connection, around 5.5km of underground cable will be laid between the BESS site and t
Read More
09/09/2026
SSEN Transmission has launched a new Strategic Investment Fund to back large-scale projects that strengthen skills and employability and tackle fuel poverty across the north of Scotland, as part of a commitment to deliver at least £12m to communities over the next two years. The Strategic Investmen
Read More
09/09/2026
Cala Homes has appointed Neil Riddell as Managing Director of its East of Scotland business, which covers Edinburgh, the Lothians, Perth and Kinross, Fife and the Scottish Borders. Riddell steps up following a successful stint as Construction Director and a key board member within Cala's West of Sc
Read More
09/09/2026
SP Energy Networks has opened a new operational hub in Knowsley, Merseyside, as it increases investment in people, infrastructure and facilities to meet rising electricity demand across the region. Located at Hub50 within Knowsley Business Park, the base offers a modern, efficient working environme
Read More
SEEIT3DSinclair Industries LtdOrd Industrial & Commercial Supplies LtdPlant Machinery TradingLowland ArchitectsComplete Property ServicesLothian Bricklaying ServicesOptimo Waste LTDModern Roofing Scotland LtdWasteMan LTD