Work on a £1.1 million swimming pool refurbishment is now complete in Moray.
The six-month scheme at Forres swimming pool has seen a range of new energy efficiency measures installed and the facility will reopen on Monday, 24 October.
Features include replacing most of the main plant and equipment as well as the boilers. In addition, energy saving systems have been developed including a heat recovery unit interfaced with solar panels linked to the council's building energy management system.
Other upgrades include a new insulated roof, insulated walls and new high performance doors and windows. A more efficient pool filtration system has also been installed.
The council's sport and leisure manager, Ken Brown, said: "Forres swimming pool has offered considerable scope in terms of energy saving on a spend-to-save basis which will result in a quality leisure facility with enhanced energy and environmental benefits and reduced running costs."
(LM/MH)
Scotland
UK
Ireland
London











