Work to repair a railway line in the Highlands is now complete.
Engineers have finished repairing the line between Fort William and Mallaig after a landslip occurred near Lochailort on Thursday, 11 August.
Over 100 tonnes of stone and mud was deposited across 70 meres of the track after the mountainside above the railway gave way.
Engineers spent 48 hours over the weekend diverting floodwater and clearing material from the line. Work included replacing washed away ballast beneath the track and stabilising the slope above the line to minimise future landslip risks.
(LM/CD)
Scotland
UK
Ireland
London










