Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 13,933 companies....

Construction News

23/03/2016

Glasgow Creation Centre Project Secures £2.6m In Grant Funding

A total of £2.6 million in grant funding has been awarded towards the development of Scotland's first Creation Centre.

Last month a number of pledges were made for the £4.9m Briggait Creation Centre project in Glasgow.

These include over £1m from the Heritage Lottery Fund (HLF), £1m from Creative Scotland and £622,000 from the Scottish Government's Regeneration Capital Grant Fund.

In addition, the city council has already promised £1m.

The project, led by Wasps Artists' Studios, will complete the regeneration of the Grade A-listed Briggait, providing a dedicated base for dance and the expanding physical performance sector.

Once completed, it will become a hub for 600 professional artists, physical performers and dancers as well as home to five different arts organisations.

-- Advertisement --
NorthernAsbestosServicesLtd

Key features include:

• Five dance/physical performance studios from 1,200 sq ft to 5,000 sq ft

• Scotland's first dedicated workspace for physical performance

• Scotland's first space specially equipped for flying trapeze

• A new public dance facility for Glasgow

• Exemplar inclusive studio and changing facilities for disabled users

• A social enterprise café

• Facilities for 12,000 participants to improve their health and wellbeing

• 100,000 visitors per year to the Briggait

• An inclusive dance studio with hoist and tracking systems and a registered 'Changing Places' toilet for disabled people.

Philip Deverell, Director of Strategy at Creative Scotland, said: "The Briggait Creation Centre will be a significant addition to our national arts infrastructure and cultural landscape providing a dedicated facility for performance arts and dance, and will be the largest of its kind in Scotland.

"The development will reinvigorate the wider Briggait complex and make it a genuinely public facing building, breathe life into the Clyde Waterfront in the heart of Glasgow, and inspire people of all ages to engage in physical activity and creative performance."

(LM/JP)

Latest Construction News

20/10/2026
Scotland's leading public sector framework provider has opened bidding for a £900 million Refurbishment and Modernisation programme aimed at delivering urgent and planned works across housing and public buildings. The Scottish Procurement Alliance's Refurbishment and Modernisation framework (RM4S)
Read More
20/10/2026
A £1 million grant programme has been launched to help owners return vacant listed buildings across Glasgow to productive use. The Heritage Building Viability Grant Scheme, funded by Glasgow City Council and administered by Glasgow City Heritage Trust, is designed to bring floorspace in some of the
Read More
20/10/2026
Road resurfacing on the A702 at West Linton will take place over six nights from Monday 9 to Friday 13 November, and on Monday 16 November 2026, requiring overnight closures. Transport Scotland's operating company, BEAR Scotland, will deliver the scheme. For safety, the A702 will be closed each ni
Read More
20/10/2026
SP Energy Networks chief executive Nicola Connelly has welcomed the launch of a new industry plan setting out how the biggest grid upgrade in living memory will boost employment and economic growth across the UK. The Electricity Networks Sector Growth Plan – led by the Energy Networks Association (
Read More
20/10/2026
An £8 million scheme is under way to enhance accessibility for passengers at Dalwhinnie and improve performance on the Highland Main Line. The project will install a new crossover so trains can switch between tracks, enabling northbound services to use Platform 1 when step-free access is required.
Read More
20/10/2026
The Scottish Government intends to award Wills Bros Civil Engineering Ltd the contract to dual the A9 between Pitlochry and Killiecrankie, Economy, Tourism and Transport Secretary Stephen Flynn has announced. The move represents the final stage of procurement for the fifth A9 Dualling scheme to rea
Read More
20/10/2026
Residents in Clackmannanshire are already benefiting from a new electric nine-seater minibus provided by Robertson Construction Central East, part of the contractor's social value commitments linked to the Wellbeing Village and Lochies School development in Alloa. During construction, the vehicle i
Read More
20/10/2026
A major new study will examine how climate change could trigger cascading disruption across Scotland's critical infrastructure, giving organisations a clearer view of risks to the services people rely on daily. Commissioned by the Climate Ready Infrastructure Scotland Forum (CRIS) — a partnership o
Read More
20/10/2026
Clark Contracts has secured a place on Pagabo's Major Works Framework, enhancing its ability to support public sector bodies in delivering major construction and refurbishment schemes. The framework, expected to be worth up to £5bn over four years, follows the creation of a 10-year strategic delive
Read More
20/10/2026
North Ayrshire Council has carried out its annual winter dry run this month as it gets ready for the colder months. Roads staff took part in the exercise as part of preparations to keep roads, footways and communities safe and accessible during severe weather. It follows a meeting of Cabinet at wh
Read More
SEEIT3DCRGP LimitedKrew-basePro Vent ComplianceKelly TanksDiscount Kitchens and Bathrooms LtdDunedin Stone LtdMaterials Market UK Trading LtdForde Training Services LtdGreater Good Glass Ltd