Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,045 companies....

Construction News

20/11/2014

Construction Of Care Village 'On Schedule'

Fife Council has said the building of a new care village at Ostler's Way, Kirkcaldy, continues to remain on schedule.

The local authority added that the development should meet its target complete date of September 2015.

There are plans that the 60-bed care home will be made wind and watertight by Christmas, while work on the interior layout and fittings will follow in the new year. Alongside the care home, a total of 26 affordable properties are being constructed on the site; these consist of a mix of two-bedroom Extra Care and Specific Needs bungalows and will provide additional support to tenants than traditional sheltered housing.

-- Advertisement --
NorthernAsbestosServicesLtd

Those living in the 'extra care' housing will have their own individual home, with their own front door. They will also be made fully accessible, while communal spaces and gardens at the care home are to be created with help from residents.

Councillor David Ross, Leader of Fife Council, commented: "Through the care village concept we are providing older people with high quality care and accommodation.

"While our main aim is to enable elderly people to remain at home and be independent for as long as possible, the time may come when a person needs long term care and support.

"Through the development of the care villages we are providing choices and investing in care for some of our most vulnerable citizens to meet their needs now and in the future."

Explaining the adjacent housing development, Councillor Ross added: "By providing 'extra care' housing rather than the traditional sheltered housing model we are responding to individual needs so that older people can have a range of housing options. It lets them live independently in a modern caring environment with extra support available when needed."

(JP/CD)

Latest Construction News

20/07/2026
SSEN Transmission has begun drilling at Rattray Head, near Peterhead, marking a key construction milestone for the Spittal to Peterhead High Voltage Direct Current (HVDC) scheme. Work that commenced this month involves Horizontal Directional Drilling (HDD) beneath the coastline to forge the critica
Read More
20/07/2026
Family-owned, Glasgow-based housebuilder AS Homes Scotland has submitted a planning application for 59 new affordable homes in Glasgow's East End, in partnership with Home Group, one of the UK's largest providers of high-quality housing and integrated health and social care support. Located on the
Read More
20/07/2026
The Construction Industry Training Board (CITB) and the Federation of Master Builders (FMB) have launched a new RMI (Retrofit) Sector Skills Plan, developed with input from the Sector Advisory Group on which NFRC sits. NFRC has welcomed the plan and its aims. Focusing on domestic retrofit and on he
Read More
20/07/2026
Three Robertson-delivered projects have been recognised by the Royal Institution of Chartered Surveyors (RICS) as exemplars of the built and natural environment across the UK at recent regional ceremonies. In Scotland, the comprehensive refurbishment of BlackRock's Edinburgh office secured the Comm
Read More
20/07/2026
Glasgow city centre will be handed over to families for a celebratory weekend as the refurbishment of George Square reaches its next milestone. The phased reopening is already under way, with the north carriageway returning to use on 26 June following works that began in May last year. Plans are b
Read More
20/07/2026
As Andy Burnham prepares to enter Downing Street, the Federation of Master Builders (FMB) has urged the incoming Prime Minister to prioritise rapid housing delivery and targeted support for small construction firms as the economy stagnates. Making the call, Brian Berry, Chief Executive of the FMB s
Read More
20/07/2026
Scottish Ministers have granted consents and marine licences for the North and South Caledonia offshore wind farms in the Moray Firth. Together, the schemes will cover around 429 km² and host up to 140 wind turbines. According to the projects, they could generate enough electricity annually to supp
Read More
20/07/2026
SSEN Transmission has revised plans for a temporary construction compound near Contin after listening to concerns raised by the local community during consultation and engagement. The facility, which will support delivery of the mainland underground cable section of the Western Isles HVDC Link, wil
Read More
17/07/2026
Construction has begun on a new £3.3 million paint facility at BAE Systems’ Govan shipyard in Glasgow as part of a wider programme to modernise the city's naval shipbuilding infrastructure. The new facility will allow ship blocks to be painted in a dedicated space, freeing up existing areas at the
Read More
17/07/2026
Retrofit and energy-efficiency specialist Procast Group has secured two awards at the Energy Efficiency Awards, with apprentice electrician Cameron Sleith also recognised as Apprentice of the Year. The company was named Regional Insulation & Fabric Installer and Contractor of the Year at the awards
Read More
SEEIT3DModern Roofing Scotland LtdWasteMan LTDRRS GroundworksGlazing and Repairs Window and Door SpecialistsBaseline Contracts LTDTHE HOME ARCHITECTWT ConsultancyDonnelly Safety ServicesCTW Safety LTD