Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,045 companies....

Construction News

30/11/2012

Considerate Construction Scheme Releases New Code

The Considerate Construction Scheme (CCS) has just released a new code of practice which has been in development for three years.

All CCS-registered sites will be assessed on the new five-point code from 1 January next year.

Scheme monitors will be using the new supporting checklist when assessing registered sites and companies.

The new system follows 15 years of an unchanged eight-point code. CCS felt that it was time to raise the bar due to rising standards, as well as the fact that so few sites were failing to meet the code.

From 1 January 2013, the five sections of the code will be:

-- Advertisement --
NorthernAsbestosServicesLtd

- Enhancing the appearance

- Respecting the community

- Protecting the environment

- Securing everyone’s safety

- Caring for the workforce.

Each section will also be accompanied by an aspirational statement, followed by four bullet points to detail the areas the scheme will consider within that section.

Each section is scored out of 10 points, a score of 5 in each section signifying compliance.

Achieving a score of 10 will require registered sites or companies to use innovative practices or thinking that can be considered to be advancing the standards by which the image of the industry is judged.

Scheme chief executive Edward Hardy said: "After three years in development, the scheme is pleased to publish the new code and supporting documents. Working with a number of contractors and clients throughout the review process, the scheme is confident that the new code remains in keeping with the industry’s values, and presents an exciting challenge for registered sites and companies in raising the benchmark of considerate construction."

(IT)

Latest Construction News

20/07/2026
SSEN Transmission has begun drilling at Rattray Head, near Peterhead, marking a key construction milestone for the Spittal to Peterhead High Voltage Direct Current (HVDC) scheme. Work that commenced this month involves Horizontal Directional Drilling (HDD) beneath the coastline to forge the critica
Read More
20/07/2026
Family-owned, Glasgow-based housebuilder AS Homes Scotland has submitted a planning application for 59 new affordable homes in Glasgow's East End, in partnership with Home Group, one of the UK's largest providers of high-quality housing and integrated health and social care support. Located on the
Read More
20/07/2026
The Construction Industry Training Board (CITB) and the Federation of Master Builders (FMB) have launched a new RMI (Retrofit) Sector Skills Plan, developed with input from the Sector Advisory Group on which NFRC sits. NFRC has welcomed the plan and its aims. Focusing on domestic retrofit and on he
Read More
20/07/2026
Three Robertson-delivered projects have been recognised by the Royal Institution of Chartered Surveyors (RICS) as exemplars of the built and natural environment across the UK at recent regional ceremonies. In Scotland, the comprehensive refurbishment of BlackRock's Edinburgh office secured the Comm
Read More
20/07/2026
Glasgow city centre will be handed over to families for a celebratory weekend as the refurbishment of George Square reaches its next milestone. The phased reopening is already under way, with the north carriageway returning to use on 26 June following works that began in May last year. Plans are b
Read More
20/07/2026
As Andy Burnham prepares to enter Downing Street, the Federation of Master Builders (FMB) has urged the incoming Prime Minister to prioritise rapid housing delivery and targeted support for small construction firms as the economy stagnates. Making the call, Brian Berry, Chief Executive of the FMB s
Read More
20/07/2026
Scottish Ministers have granted consents and marine licences for the North and South Caledonia offshore wind farms in the Moray Firth. Together, the schemes will cover around 429 km² and host up to 140 wind turbines. According to the projects, they could generate enough electricity annually to supp
Read More
20/07/2026
SSEN Transmission has revised plans for a temporary construction compound near Contin after listening to concerns raised by the local community during consultation and engagement. The facility, which will support delivery of the mainland underground cable section of the Western Isles HVDC Link, wil
Read More
17/07/2026
Construction has begun on a new £3.3 million paint facility at BAE Systems’ Govan shipyard in Glasgow as part of a wider programme to modernise the city's naval shipbuilding infrastructure. The new facility will allow ship blocks to be painted in a dedicated space, freeing up existing areas at the
Read More
17/07/2026
Retrofit and energy-efficiency specialist Procast Group has secured two awards at the Energy Efficiency Awards, with apprentice electrician Cameron Sleith also recognised as Apprentice of the Year. The company was named Regional Insulation & Fabric Installer and Contractor of the Year at the awards
Read More
SEEIT3DADAM Roofing Services GlasgowCarla MacKay InteriorsKFP Services LTDWindow StoreAberroof AberdeenArctic Spas RosebankBairds Windows LtdJRF Chimney Specialists and Heating DistributorsEuro-Fab (Scotland)