Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,045 companies....

Construction News

15/02/2012

Consent For Commercial Wave Power Array

Scotland’s first near shore commercial wave power array, which will power more than 1,000 homes, has been approved by Energy Minister Fergus Ewing.

Two new Oyster wave energy converters will be added to an existing device at the European Marine Energy Centre (EMEC) at Billia Croo, Orkney, to allow operators Aquamarine Power to test the devices as an array.

Each of the machines has a capacity of 800 Kilowatts, bringing the total capacity of the array to 2.4MW.

Although the machines are demonstrators, the array will be the first near shore wave array in Scotland to be connected to the National Grid, and will supply enough electricity to power more than 1,000 homes.

-- Advertisement --
NorthernAsbestosServicesLtd

Energy Minster Fergus Ewing said: "I am delighted to grant consent to these two new Oyster devices, the first nearshore wave array in Scotland to feed in to the National Grid.

"This array will supply more than 1,000 homes with clean energy, and should the demonstrator be successful the technology being developed here will power hundreds of thousands more homes in future.

"Scotland has unparalleled natural resources, with a tenth of Europe’s wave power, and these new devices will help us to fully harness the huge energy resources around our own coast and contribute to global efforts to expand clean, green electricity generation.

"Scotland is in the midst of a renewables revolution, and it is innovation and creativity such as that behind the Oyster device which will help us meet our ambitious renewable electricity targets and help us reindustrialise Scotland."

The application has been granted subject to the implementation of a suitable Environmental Monitoring and Mitigation Plan to ensure suitable measures are taken to protect the environment.

(GK)

Latest Construction News

20/07/2026
SSEN Transmission has begun drilling at Rattray Head, near Peterhead, marking a key construction milestone for the Spittal to Peterhead High Voltage Direct Current (HVDC) scheme. Work that commenced this month involves Horizontal Directional Drilling (HDD) beneath the coastline to forge the critica
Read More
20/07/2026
Family-owned, Glasgow-based housebuilder AS Homes Scotland has submitted a planning application for 59 new affordable homes in Glasgow's East End, in partnership with Home Group, one of the UK's largest providers of high-quality housing and integrated health and social care support. Located on the
Read More
20/07/2026
The Construction Industry Training Board (CITB) and the Federation of Master Builders (FMB) have launched a new RMI (Retrofit) Sector Skills Plan, developed with input from the Sector Advisory Group on which NFRC sits. NFRC has welcomed the plan and its aims. Focusing on domestic retrofit and on he
Read More
20/07/2026
Three Robertson-delivered projects have been recognised by the Royal Institution of Chartered Surveyors (RICS) as exemplars of the built and natural environment across the UK at recent regional ceremonies. In Scotland, the comprehensive refurbishment of BlackRock's Edinburgh office secured the Comm
Read More
20/07/2026
Glasgow city centre will be handed over to families for a celebratory weekend as the refurbishment of George Square reaches its next milestone. The phased reopening is already under way, with the north carriageway returning to use on 26 June following works that began in May last year. Plans are b
Read More
20/07/2026
As Andy Burnham prepares to enter Downing Street, the Federation of Master Builders (FMB) has urged the incoming Prime Minister to prioritise rapid housing delivery and targeted support for small construction firms as the economy stagnates. Making the call, Brian Berry, Chief Executive of the FMB s
Read More
20/07/2026
Scottish Ministers have granted consents and marine licences for the North and South Caledonia offshore wind farms in the Moray Firth. Together, the schemes will cover around 429 km² and host up to 140 wind turbines. According to the projects, they could generate enough electricity annually to supp
Read More
20/07/2026
SSEN Transmission has revised plans for a temporary construction compound near Contin after listening to concerns raised by the local community during consultation and engagement. The facility, which will support delivery of the mainland underground cable section of the Western Isles HVDC Link, wil
Read More
17/07/2026
Construction has begun on a new £3.3 million paint facility at BAE Systems’ Govan shipyard in Glasgow as part of a wider programme to modernise the city's naval shipbuilding infrastructure. The new facility will allow ship blocks to be painted in a dedicated space, freeing up existing areas at the
Read More
17/07/2026
Retrofit and energy-efficiency specialist Procast Group has secured two awards at the Energy Efficiency Awards, with apprentice electrician Cameron Sleith also recognised as Apprentice of the Year. The company was named Regional Insulation & Fabric Installer and Contractor of the Year at the awards
Read More
SEEIT3DListers Concrete PumpingADAM Roofing Services GlasgowCarla MacKay InteriorsKFP Services LTDWindow StoreAberroof AberdeenArctic Spas RosebankBairds Windows LtdJRF Chimney Specialists and Heating Distributors