Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,047 companies....

Construction News

02/08/2010

Lockerbie Man's Skull Crushed In Six Metre Fall

lan Hind, from Corrie Common near Lockerbie was left with a crushed skull and permanent brain damage after falling through an industrial roof he was working on in Carlisle.

His employers were last week fined a total of £13,000.

The Health and Safety Executive (HSE) prosecuted brothers Robert and Eric Murray following the incident at Watts Yard on London Road in Carlisle on 27 February 2008.

Carlisle Crown Court heard that Robert Murray was in overall control of the project, and that his brother, Eric, was in charge of dismantling the building Mr Hind was working on.

Alan Hind was helping to demolish an industrial building in Carlisle when he fell six metres to the concrete floor below. The 28-year-old's sight, hearing and personality have been permanently affected.

In the fall, Alan Hind suffered 16 skull fractures, broke his jaw in three places, fractured his wrist, damaged a kidney and is now deaf in his right ear and blind in his left eye. Parts of his brain were so badly damaged that they had to be removed.

-- Advertisement --
NorthernAsbestosServicesLtd

Mr Hind has been unable to return to work since the incident, and had to wait six months for a titanium plate to be inserted into his damaged skull. He said: "It was a frightening time. There was nothing to protect my brain - just skin. I was worried to go out. I didn't like to be around lots of people in case I bumped my head."

Eric Murray, trading as E.J. Murray (Steel Structures), was found guilty of a health and safety offence following a trial at Carlisle Crown Court last month. He was prosecuted for breaching Regulation 6(3) of the Work at Height Regulations 2005 by failing to take measures to prevent workers falling and being injured.

Robert Murray, trading as Murray Structures, pleaded guilty to breaching Regulation 5 of the Work at Height Regulations 2005 by not hiring trained workers, and Regulation 29(1) of the Construction (Design and Management) Regulations 2007 by failing to ensure the work was planned and carried out safely.

David Charnock, HSE Construction Inspector in Cumbria, said: "Mr Hind is lucky to be alive following his fall, which could and should have been prevented. He sustained multiple injuries which will affect him for the rest of his life.

"Unfortunately neither Robert nor Eric Murray took the necessary safety precautions and Mr Hind suffered horrific injuries as a consequence. The workers they employed were casual labourers and did not have the skills or experience to work on industrial roofs.

"As this incident demonstrates, carrying out work at height can result in serious injury and even death if not properly planned. Steps must be taken to prevent people falling, and everyone involved in the work must be properly trained."

Robert Murray, of Carlyle's Place, Annan, Dumfriesshire, was fined £8,000 and ordered to pay £4,000 towards the cost of the prosecution at Carlisle Crown Court on 29 July 2010. Eric Murray, of Dalton, Lockerbie, Dumfriesshire, was fined £5,000 and ordered to pay costs of £8,000.

(GK)

Latest Construction News

22/07/2026
The £26m Grade A office at Dundee Waterfront, delivered by Robertson for Dundee City Council as part of the city's £1.6bn regeneration programme, has reached full occupation after global software firm N-able joined existing tenant Thorntons. Built by Robertson Construction Tayside, the six-storey J
Read More
22/07/2026
Ground has broken on a permanent spectator stand and team dugouts at the Meadowbank grass pitch at Kirkwall Grammar School (KGS). The project is fully funded by the Scottish Football Association and was proposed by the newly formed Orkney Football Hub, which brings together representatives from Ork
Read More
22/07/2026
Transport Scotland's operating company, BEAR Scotland, will renew approximately 900 metres of road surface to deliver smoother and safer journeys for drivers. A signed diversion will be in place, directing traffic to remain on the M9 northbound to turn at Junction 9, then return southbound to exit
Read More
22/07/2026
CCG (Scotland) has started the second phase of the Athletes' Village development in Glasgow's East End, beginning construction of 58 affordable homes for mid-market rent aimed at households on low to middle incomes. The scheme is funded by socially conscious investor Thriving Investments and marks
Read More
22/07/2026
The Scottish Government is increasing support for small and medium-sized haulage firms by allocating an additional £1 million to its SME Fleet Analysis Support fund, following strong interest from operators across the country. This next phase will enable more businesses to access tailored assessmen
Read More
22/07/2026
Galliford Try has been selected for the new Crescent Purchasing Consortium (CPC) Construction and Capital Works framework. The company’s appointment spans all five regional lots across England, Wales and Scotland. The framework, which will run for a maximum of eight years, will be used to procure a
Read More
22/07/2026
SP Energy Networks is rolling out advanced technology to ensure Glasgow's electricity system is ready to support athletes, officials and visitors during Glasgow 2026. As part of a major resilience programme, the network operator has been testing Power Survey's state-of-the-art Mobile Asset Assessme
Read More
22/07/2026
Major strides have been made in recent months on the Corran Ferry Infrastructure Improvement Scheme (CFIIS), with activity advancing at both Nether Lochaber and Ardgour. Supported by £30 million via the Inverness and Highland City-Region Deal—comprising £20 million from the UK Government and £10 mi
Read More
21/07/2026
Kier has been appointed to the new YORhub YORbuild Major Works 2 framework, worth £1.5bn, enhancing its capacity to deliver major public sector projects across Yorkshire and the Humber, the North East and neighbouring areas. The framework provides access to substantial building schemes for eligible
Read More
21/07/2026
Residents, community organisations and other stakeholders are being urged to share their views in the latest phase of Stirling's new Local Development Plan (LDP) consultation before the deadline. This round focuses on the overall spatial strategy for the area and the specific site options being cons
Read More
SEEIT3DElectrac NISOLV GROUPDryburgh Associates LimitedFyfe BrickworkInverness Core Drilling LtdStuart King Architecture & Design LtdNew Home Quality ControlRural House LtdJames Macqueen Building Contractors Ltd